Browse
Search
2006 NS Contract - Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 11:37:32 AM
Creation date
9/2/2010 9:49:29 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5p
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />Name: Mr. And Mrs. Grasty Page 3 of 15 <br />Address: 119 Hayes Street <br />__ __ -City: - -- Hillsborough __ _ _ - ---- --_ __ __ -_ -_ _ --- <br />Phone #: 732-3608 <br />Date: <br />Supply and install one new triple 2 x 8 girder approximately 8 l.f. long at <br />same location. Re-install one existing screw jack and supply and install <br />two new screw jacks at same locations and connected to new girder, <br />complete. <br />Includes structural connections from new girder to existing floor framing. <br />If disconnection of existing plumbing, electrical or other utilities becomes <br />necessary during course of project such work shall be performed in an <br />efficient, workmanlike manner so as to keep "down time" and temporary <br />connections to a minimum. Price indicated does not include interior and <br />exterior cosmetic repairs, patching cracks, painting, adjusting doors and <br />windows, repair of siding, plumbing or electrical. All work to code. <br /> <br />3. Replace approximately two missing brick on top of existing. brick column <br />at center of front foundation wall. Supply and install new mortar between <br />top of top bricks and existing sill. <br />4. Replace approximately two missing brick on top of existing brick column <br />at right end of existing center girder. Supply and install new mortar <br />between top of top bricks and existing sill. <br />5. At left end of existing center girder, supply and install new mortar <br />between top of top bricks and existing sill and end of girder. <br />6. Re-secure existing joist located behind center girder to restore to proper <br />working order. Secure with blocking, metal brackets and screws to <br />existing framing members. <br />7. Supply and install new mortar to re-install approximately six (6) existing <br />brick in right side foundation wall where HVAC equipment penetrates <br />wall. New material to match existing as close as practical. <br />
The URL can be used to link to this page
Your browser does not support the video tag.