Browse
Search
2006 NS Contract - Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 11:37:32 AM
Creation date
9/2/2010 9:49:29 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5p
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Mr. And Mrs. Grasty Page 12 of 15 <br />_ Address: 17-9 I~ay_es _Street____ -- - <br />__. <br />City: Hillsborough <br />Phone #: 732-3608 <br />Date: <br />J. GENERAL REPAIlZS <br />1. Supply and install new attic access panel in upstairs room to rear attic in <br />wall directly across from access panel in front wall. Includes all necessary <br />framing for new opening, trim, panel, hardware, and doorknob. New <br />panel and new materials to match existing as close as practical. <br /> <br />2. Remove vines and other shrub growth attached to left front corner of <br />house and porch. Existing siding and structure of house and porch to <br />remain intact. <br />3. Supply and install new exterior clear latex silicone paintable caulking to <br />all siding/trim joints and siding butt joints on exterior of house. Carefully <br />apply a thin bead so as to prevent "over-spread" of caulking on to adjacent <br />exposed surfaces. <br /> <br />K. SITE IlVIPROVEMENTS <br />1. Supply and install underground drainpipe for each gutter downspout, <br />approximately eight (8), to slope away from house and terminate or <br />"daylight" at least 10 l.f. down-slope from house. Includes trenching, <br />direct connection from gutter downspouts to drainpipe, backfill, and <br />restore trench areas to original working order as close as is practical. All <br />connectors and drain pipe to be solid flexible material. All work <br />complete. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.