Browse
Search
2006 NS Contract - Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 11:37:32 AM
Creation date
9/2/2010 9:49:29 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5p
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />Name: Mr. And Mrs. Grasty Page 10 of 15 <br />_ Address~_1.19_H__a~/es Street--__- ---- -----_-- - -- --- -------- ---- - -- <br />City: Hillsborough <br />Phone #: 732-3608 <br />Date: <br />F. MECHANICAL <br />1; Supply and install mastic sealant material to all HVAC register boots to <br />provide weather-tight seal between boot and floor/wall, complete. Sealant <br />to be left smooth and uniform with floor/wall surface. <br />2. In front attic, remove approximately 12 l.f. of damaged HVAC ducting . <br />Supply and install approximately 12 l.f. of new insulated flexible HVAC <br />ducting at same location, with R-6 rating, including proper connection to <br />existing supply duct and two existing registers, complete. New materials <br />to match existing as close as practical. <br />3. Supply and install galvanized metal hood over existing HVAC duct <br />housing for ducts extending from exterior gas pack unit through <br />foundation wall. New hood to extend under bottom edge of existing lap <br />siding, to be removable and provide weathertight barrier. Seal transitions <br />from new hood to existing metal housing. New materials to match <br />existing as close practical. <br />4. Provide temporary support under each side of existing water heater <br />platform to maintain proper service connections to water heater. <br />Temporary disconnection of existing plumbing, electrical, gas or other <br />utilities which become necessary during course of project shall be <br />performed in an efficient, workmanlike manner so as to keep "down time" <br />and temporary connections to a minimum. Partially remove existing <br />temporary support under platform to accommodate excavation for new <br />block support. Excavate under left and right front corners of platform to <br />solid soil to accommodate installation of new solid concrete block support. <br />Supply and install new concrete block support under left and right front <br />corners of platform, with mortar packed between top of block and bottom <br />of platform, complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.