Browse
Search
2006 NS Contract - Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 11:37:32 AM
Creation date
9/2/2010 9:49:29 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5p
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br />Name: Mr. And Mrs. Grasty Page 7 of 15 <br />_ _ _ Address: 119 Hayes Street _ _ _ <br />---____ <br />qty: Hillsborough - - - <br />Phone #: 732-3608 <br />Date: <br />junction boxes in attic and underfloor shall be located so they are not <br />covered by insulation. All work to code. <br />2. Separate and add circuits to alleviate overloaded circuits on electrical <br />system. HVAC, washing machine and microwave to each be on separate <br />circuits. <br />3. Properly disconnect wiring and extension cord to existing attic fan. <br />Supply and install new junction box and properly run connect electrical to <br />existing fan location. Remove existing fan and replace with new fan unit. <br />New fan to have thermostat control. Restore to proper working order, <br />complete. <br />4. Supply and install cover plate on existing junction box in crawlspace, <br />complete. <br />5. Properly remove tape repair and disconnect existing wire in crawlspace. <br />Supply and install new junction box and properly connect electrical to <br />restore to proper working order, complete. <br />6. Properly disconnect wiring at existing switch in crawlspace under Living <br />Room. Supply and install new junction box and properly connect <br />electrical to restore to proper working order, complete. <br />7. Supply and install new electrical to accommodate one new light in <br />crawlspace under porch, including one switch control located in <br />crawlspace within 3 l.f. of access door. Supply and install new fixtures, <br />complete. <br />8. Supply and install new electrical to accommodate two new light fixtures <br />evenly distributed throughout front portion of crawlspace under house, <br />
The URL can be used to link to this page
Your browser does not support the video tag.