Orange County NC Website
7.14 Construction stake-out of any site features or details <br />7.15 Permit Application Fees, Site Plan Fees, Re-review Fees, or other associated fees, such as for <br />Sungate <br />7.16 Design of any water or sewer disposal or treatment facilities <br />7.17 Plats and easement maps <br />7.18 Off-site road improvements <br />7.19 Environmental assessments other than Wetlands Delineation <br />7.20 Wetlands/stream disturbance permitting <br />7.21 Surveying <br />7.22 Design and Engineering of the main road from Old NC 86, Lake Hogan Farm Road extension, <br />and the sewer outfall across the park <br />The Site Consultant will not be responsible for or have control or charge of construction means, methods, <br />techniques sequences or procedures or for safety precautions and programs in connection with the work, <br />and will not be responsible for the contractors failure to carry out the work in accordance with the contract <br />documents. The Site Consultant will not be responsible for or have control or charge over the acts or <br />omissions of the contractor, subcontractors or any other agents or employees or any other persons <br />performing any of the work. It will be the responsibility of the contractor to verify the depth and location <br />of all underground utilities prior to starting construction. Should any underground utility not be located as <br />shown on the drawings, the contractor will notify the Site Consultant immediately before starting any <br />construction for a resolution of the discrepancy. The Site Consultant will be saved harmless from any <br />damaged utility during construction with the cost for repairing any underground utility borne by the <br />contractor. <br />SCHEDULE <br />Incorporated herein is the Northern Community park and Twin Creeks Park (Phase 1) Detailed Project <br />Timetable. The Site Consultant will confer with the Owner immediately if it is felt that a milestone date <br />will not be met as cited. <br />Northern Community Park <br />Design Development by 10/31/06 <br />Construction Documentation by 12/31/06 <br />Engineering Approvals by 2/28/07 <br />Bidding and Negotiation by 4/30/07 <br />Construction Observation/As-Builts through 6/30/08 <br />Twin Creeks Districty Park <br />Design Development/Submit CUP Application by 3/31/07 <br />CUP Approval by 3/31/08 <br />Construction Documentation through 5/31/08* <br />Engineering Approvals by 7/31/08* <br />Bidding and Negotiation by 8/30/07* <br />Construction Observation/As-Builts through 8/30/09* <br />* assumes 12 month CUP Approval by Carrboro, 4 month Final Plan Approval by Canboro <br />The Site Consultant shall notify the Owner immediately of any staffing changes to project personnel <br />assigned to these projects. <br />OWNER RESPONSIBILITIES: <br />The Owner will appoint a representative through which all communications with the Site Consultant will <br />take place. The Site Consultant will be allowed access to the site at all times. The Owner will be <br />responsible for payment of any and all permit and application fees. The Owner will keep the Site <br />Consultant apprised of all relevant information that could affect the work. The Owner will also be <br />