Orange County NC Website
• Preliminary Civil Related Site Details as required for Site Plan Approval <br />• Any supplementary storm drainage calculations and analysis as needed for Site Plan <br />Approval <br />• Preliminary Site Lighting Plan <br />• Preliminary Landscape Plan <br />2.02 Attend progress meetings with the Owner to coordinate site plan Drawings <br />2.03 Site visits as necessary to determine site conditions <br />2.04 Submit Conditional Use permit Application to Town of Carrboro for review and approval <br />2.05 Advertise and Facilitate Neighborhood Information Meeting <br />2.06 Attend Staff Review Meetings <br />2.07 Revise Plans as directed by Staff to receive recommendation for Conditional Use Permit A <br />Approval <br />2.08 Present to Town Advisory Boards at a Courtesy Review <br />2.09 Present to Town Advisory Boards for final plan recommendations <br />2.10 Present to Board of Aldermen for CUP Approval <br />2.11 Develop Opinion of Probable Construction Costs. These estimates will be done in context with <br />period during which construction is expected to be occurring, so as to capture hyper- <br />inflationary construction environment we are currently experiencing. <br />3. Construction Documentation <br />3.01 Prepare plans, specifications and support calculations suitable for approvals, pricing and <br />Construction of site elements <br />^ General Demolition Plan showing structures, pavements and known utilities to be removed <br />and relocated <br />^ Layout Plan showing pedestrian and vehicular pavements, building locations, fields, <br />recreation areas <br />^ Grading and storm drainage plan including necessary storm water BMP's <br />^ Sports Fields including irrigation and design of well location <br />^ Site Lighting <br />^ Erosion Control Plan <br />^ Vehicular and Pedestrian pavements <br />^ Site Construction Details <br />^ Specify a pre-fab combination picnic shelter/restroom building with associated <br />water/sewer/power connections <br />3.02 Design and documentation for storm drainage piping, erosion control and other support data and <br />details suitable for bidding, approval from all regulatory agencies (NCDOT, local engineering, <br />NCDENR) and construction. <br />3.03 Compliance with all design criteria's established by local, state and federal regulatory agencies <br />3.04 Develop Opinion of Probable Construction Costs. These estimates will be done in context with <br />period during which construction is expected to be occurring, so as to capture hyper-inflationary <br />construction environment we are currently experiencing. <br />4. Engineering and Regulatory Agency Approvals <br />4.01 NCDENR Erosion Control Permit for land disturbing operations for grading of site <br />4.02 NCDOT Driveway Permits as required for driveway modifications at NC 86 <br />4.03 Coordinate with Environmental Health for new irrigation system well <br />4.04 Prepare and submit plans and documents for submittal and approval to the Town of Carrboro for <br />Site Construction Plans <br />