Browse
Search
2006 S Purchasing - Coulter Jewell Thames Northern Park and Twin Creeks Park (Phase 1)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 S Purchasing - Coulter Jewell Thames Northern Park and Twin Creeks Park (Phase 1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 11:36:46 AM
Creation date
9/1/2010 3:55:25 PM
Metadata
Fields
Template:
BOCC
Date
6/27/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
9c
Document Relationships
Agenda - 06-27-2006-9c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 06-27-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.09 Construction documents for buildings (proposal assumes pre-engineered buildings) <br />7.10 Preparation of building elevations as may be required for the site plan <br />7.11 Traffic Impact Analysis <br />7.12 Construction stake-out of any site features or details <br />7.13 Permit Application Fees, Site Plan Fees, Re-review Fees <br />7.14 Design of any water or sewer disposal or treatment facilities except for imgation well <br />7.15 Plats and easement maps <br />7.16 Off-site road improvements including impacts to NC 98 <br />7.17 Environmental assessments other than Wetlands Delineation <br />7.18 Wetlands/Stream Disturbance Permitting <br />7.19 Surveying other than Wetlands Mapping <br />7.20 Flood Studies and FEMA permitting <br />7.21 Stream determination <br />B. TWIN CREEKS DISTRICT PARK <br />1: Pre-submittal Phase <br />1.01 Work with Owner and stakeholders to refine scope and general parameters of site design <br />1.02 Determine Storm Drainage and Utility Requirements <br />1.03 Meet with Town of Carrboro Planning, Public Works, Sungate Engineering, Fire and <br />Inspections to determine relevant issues and approval process <br />1.04 Work with Owner to Develop Opinions of Construction Costs <br />1.05 Conduct a Sustainability Workshop with the Owner and stakeholders <br />1.06 Determine Extents of jurisdictional wetlands on the property, prepare a map showing these <br />wetlands, file with USACOE. Work by sub consultant under this letter of agreement. <br />1.07 Meet on-site with Town of Carrboro/Sungate design to determine extents of jurisdictional <br />streams and stream buffer. Map locations of streams <br />1.07 Provide Geotechnical Investigation to determine general soil conditions, depth to any bedrock <br />less than 30' deep, pavement design recommendations and building footing design <br />recommendations. Work by sub consultant under this letter of agreement. <br />1.08 Work with Owner to select pre-engineered building type for picnic shelters <br />1.09 Meet with the design Consultants for the proposed new elementary school to the north, and the <br />proposed Ballentine subdivision by MI homes to the south to coordinate locations of trails, <br />streets and utilities <br />2. Design Development/Site Plan Approval <br />2.01 Prepare a detailed Site Plans for approval by the Town of Carrboro, showing all of the Phase <br />One requirements including but not limited to the following: <br />• Conditional Use Permit Application including Plans ,calculations and support documents <br />• Existing conditions showing zoning, resource protection ordinance requirements, setbacks, <br />buffers, and any tabular site data <br />Preliminary General Demolition Plan showing structures, pavements and known utilities <br />to be removed/relocated <br />• Preliminary layout Plan of pavements, fields, pedestrian and vehicular circulation, <br />structures and other Phase One Improvements <br />• Preliminary Grading Plan for site, including spot elevations, Storm water Study, storm <br />drainage systems layout and support calculations <br />• Preliminary Erosion Control Plan detailing any NCDENR requirements <br />• Preliminary Utility Plan showing plan views of water and sewer connection to existing <br />system <br />
The URL can be used to link to this page
Your browser does not support the video tag.