Browse
Search
Minutes - 19891204
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1989
>
Minutes - 19891204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2016 2:57:14 PM
Creation date
8/13/2008 1:02:27 PM
Metadata
Fields
Template:
BOCC
Date
12/4/1989
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Human Resources, Division of Environmental <br /> Health, pending approval of construction plans . <br /> and chemical tests of the water. It will be <br /> monitored and opera;eda public utility <br /> company licensed by the State. <br /> The concept plan for Searle Farms was approved on <br /> April 4, 1989 with the following conditions : . . <br /> 1 . All lots shall have access restricted to the <br /> new subdivision roads . <br /> 2 . Dedication of recreation/open space including <br /> the 100-year floodplain along New Hope Creek <br /> as well as pedestrian access to the <br /> subdivision (specific boundaries of the <br /> dedicated area to be determined following <br /> site evaluation by Orange County Recreation <br /> and Parks Department) . <br /> The applicant has proposed to dedicate to Orange <br /> County a 50 ' strip of land adjacent to New Hope <br /> Creek along the entire southern boundary of the <br /> subdivision. A conservation easement has been <br /> volunteered which varies in width and runs <br /> • approximately parallel to the 100-year floodplain <br /> between the dedication to Orange County and the <br /> edge of woods . Preliminary negotiations have <br /> begun with Triangle Land Conservancy for <br /> acceptance of the easement. A 25-page mode <br /> conservation easement document was submitted ' y <br /> with the preliminary plan. Crudup distributed <br /> copies of the letter received today from Triangle <br /> Land Conservancy accepting the Searle Farms <br /> conservation easement. <br /> Review comments have been addressed by conditions • <br /> included in the Resolution of Approval (copy an <br /> attachment to these minutes on pages ) . <br /> Provisions have been added to insure adequacy of . <br /> the proposed easements for septic tank disposal. <br /> Other conditions address the recreation <br /> " . dedication, the pedestrian easement, as well as <br /> the conservation easement. An erosion control <br /> plan will be required for road construction and <br /> installation of septic systems requiring <br /> easements . <br /> The Planning Staff recommends that the <br /> preliminary plan for Searle Farms be approved <br /> through the Resolution of Approval. <br /> Best asked about the Resolution of Approval and <br /> . Crudup responded that it was the same form as the <br />
The URL can be used to link to this page
Your browser does not support the video tag.