Browse
Search
2006 S Purchasing - Bid Award: Roof Replacement at New Courthouse CFE INC of Apex
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 S Purchasing - Bid Award: Roof Replacement at New Courthouse CFE INC of Apex
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2011 3:44:40 PM
Creation date
8/27/2010 4:25:02 PM
Metadata
Fields
Template:
BOCC
Date
6/13/2006
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
5q
Document Relationships
Agenda - 06-13-2006-5q
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 06-13-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
able to sureties as a defense in the jurisdiction of the suit <br />shall be applicable. <br />10 Notice to the Surety, the Owner or the Contractor shall <br />be mailed or delivered to the address shown on the sig- <br />nature page. <br />11 When this Bond has been furnished to comply with a <br />statutory or other legal requirement in the location where <br />the construction was to be pertormed, any provision in this <br />Bond conflicting with said statutory or legal requirement <br />shall be deemed deleted herefrom and provisions con- <br />forming to such statutory or other legal requirement shall <br />be deemed incorporated herein. The intent is that this <br />Bond shall be construed as a statutory bond and not as a <br />common law bond. <br />12 DEFINITIONS <br />12.1 Balance of the Contract Price: The total amount <br />payable by the Owner to the Contractor under the <br />Construction Contract after all proper adjustments <br />have been made, including allowance to the Con- <br />MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: <br />tractor of any amounts received or to be received by <br />the Owner in settlement of insurance or other claims <br />for damages to which the Contractor is entitled, re- <br />duced by all valid and proper payments made to or on <br />behalf of the Contractor under the Construction Con- <br />tract. <br />12.2 Construction Contract: The agreement between <br />the Owner and the Contractor identified on the sig- <br />nature page, including all Contract Documents and <br />changes thereto. <br />12.3 Contractor Default: Failure of the Contractor, <br />which has neither been remedied nor waived, to per- <br />form or otherwise to comply with the terms of the <br />Construction Contract. <br />12.4 Owner Default: Failure of the Owner, which has <br />neither been remedied nor waived, to pay the Con- <br />tractor as required by the Construction Contract or to <br />perform and complete or comply with the other terms <br />thereof. <br />"This Performance Bond covers construction work along with twelve months of <br />maintenance/warranty coverage against defective workmanship and materials. This bond specifically <br />excludes claims made for defective materials and workmanship beyond twelve months from the date <br />of final completion." <br />(Space is provided below for additional signatures of added parties, other than those appearing on the cover page.) <br />CONTRACTOR AS PRINCIPAL SURETY <br />Company: (Corporate Seal) Company: (Corporate Seal) <br />Signature: <br />Name and Title: <br />Address: <br />Signature: <br />Name and Title: <br />Address: <br />AIA DOCUMENT A312 -PERFORMANCE BOND AND PAYMENT BOND -DECEMBER 1984 ED. -AIA <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W. WASHINGTON, D.C. 20006 A312-1984 3 <br />THIRD PRINTING -MARCH 1987 <br />
The URL can be used to link to this page
Your browser does not support the video tag.