Browse
Search
Agenda - 09-02-2010 - 4q
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 09-02-2010 - Regular Mtg.
>
Agenda - 09-02-2010 - 4q
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2010 3:37:33 PM
Creation date
8/27/2010 3:37:32 PM
Metadata
Fields
Template:
BOCC
Date
9/2/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4q
Document Relationships
Minutes 09-02-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
ORD-2010-083 Justice Facility - Contractor Extended Overhead Request & Approval of Budget Amendment #2
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />', <br />• •&o'ttstru•ction•• Company, lac. + <br />23. January 4a', 2010-Apri128ffi: CodQ Revision end associated fiilisl~ work <br />ongoing until. d~.te of substantial. completion April 28~`, 2010. ' <br />• Associated Cost gex above time line: , <br />~ June' 17~`, 2003-August 31$ ; 2009: On Junk 11 ~', BCC received stop woxk <br />directive •on all work associated with. FM#56, at this~time BCC was <br />working on oxg contract work to the extent possible, Work was limited. to <br />.• ' • selective demolition in areas throughou# the building only. -Sub-contractor <br />work was•halted at this point until resolution could be made to move . <br />' forward with code revisions. On 3uly 1~, X009 BCC'demobilized•fromthc <br />pxojeCt site. ~ _ <br />• General~Conditions Q $324.00/day (x} 61 days = $19,724.00 <br />• Supervision & Tnsuranees @ $446A0/day (x) 61 days- *$CC <br />allocated supervision and labor forces during this period on various <br />• ~ o#her project sites throughout the company as to not layoff any of our <br />staff allocated for this project. **Upon acceptmsce of this proposal <br />BCC will not seek any further labor or supervision cost incurzed for <br />• this time period. <br />• Sub-Total during this period: $19,724.00 <br />II) August 31~; 2009 November 20~; 2009: During this period BCC <br />maintained an onsite presence of one superintendent and 2 laborers, <br />working on CP-12, site walkway revisions and misc interior up fits <br />associate with~OCBI code i1>~provements; subeont>•actor•workwos rn;nirnal <br />to non-existenx during this period of time as BCC was working under <br />premise tisat ongoing code review pricitlg would•be, approved, Cost is <br />r~ftective•of BCC workixig at MA~45% efficiency; • <br />• General Conditions ~ $324.00/day {x) 81 daps =$26,244.00 <br />• Supervision &-Insurances (a3 $446.00/day (x) 81 days = $36,126.00 <br />. • .Sub-Total during this period: $62,370,00 (-}BCC ongoing work (a3 <br />45% efficiency = $28,Q67.00 <br />• Total for this period = $34,303.00 <br />III} November 20a', 2009-December 28~', 2009: Ola. Novembex 18~', 2009, B CC <br />received letter from CRZ (Change Order G-13 Status) stating the intent of <br />the owner to execute Change Order Cr~13 and that said change order would <br />be executed no Later than December 1.5, 2009 by OCBC. Tn this letter the <br />owner also "request that you stop work on the project on any items which <br />will negatively affect or impact the future woxk of the code <br />PO Box 2935, Durham, NC 27715-2435 I00 B. Britania Ave., Durhazn, NC 27704 <br />(919) 220-1141 tel (919) 220-1147 fax • <br />RRVM.b OrdCanXCOnSCTtlctIOl7Ca.GOm <br />
The URL can be used to link to this page
Your browser does not support the video tag.