Orange County NC Website
Construction Campnny, Inc. <br />8. September 28a; 2009: OC canno# move forwaxd with sprinkler approval at this <br />time as ap~rovai~ from board is required • <br />9. October 5 , 2009: BCC provides proposal to CRZ for cost of sprinklex shop <br />drawing only. To date NO approval has been given with regards to any items' <br />associated with Field Memo #56. <br />l0.October 14~', 2009: CRZ notifies BCC that OCBI has reviewed and approved <br />associated drawing revisions {FM#56 Code Ilnpxovements}; BCC to prepare <br />revised pricing. <br />l 1.October 16a', 2009: CRZ upon approval of OC releases BCC to begin <br />preparations of sprinkler shop drawings. <br />12.October 30a; 2009: BCC provides FM#56 "Code Revisions" revised pricing to <br />CRZ for owner approval. <br />13. November2"~, 2009: BCC, CRZ and OC meet to discuss change proposal. At <br />this time OC feels as cost are still prohibitive and request BCC to revise <br />pricing again: and remove items that will be performed by the owner. Also <br />addressed at this meeting; Tom Bordeaux (BCC) and Jeff Thompson (OC) <br />discussed the additional cost incurred by BCC during this process of code <br />revision pricing and Mr. Thompson acknowledged that •Bordesu~c had incurred <br />additional cost but requested that BCC separate the extended cost from this CP; <br />Mr, Bordeaux agreed to dolls and both parties agreed to access this'cost upon <br />completion of the contract. ' <br />14. November Sa; 2009: BCC provide additional revisions requested by OC for <br />approval {CP#57R2). <br />15. November 14~, 2009: BCC stops drywall subcontractor from concealing all <br />walls and ceilings as No' further work can be done {BB or CO) at this time <br />pending owner approval on code revision. <br />16. November 16a`, 2009: CRZ notifies BCC that code improvements in the <br />existing building cannot be approved bythe-owner at this~timeg.owner will <br />have to go before BOC for approval. • <br />17. November 18a; 2009: BCC given stop work notice on code revisions by OC <br />and requested to revise CP#57R to reflect additional cost as sta#ed in CRZ <br />letter "11/18/09 Change Order G-13 Status": <br />18. November 20s', 2009: BCC demobilizes from project for a second time. <br />19. November 30a', 2009: BCC provides CRZ with Cl'#57R3 for approval and <br />execution. <br />20. December 4a ; 2009: BCC receives cover letter for CP-13 for signafiare. <br />' 21. Dece~~r 2~ , ~0'b3:~Ci/ receives nonce o'f`e~ecu ef`d. ~f'=T3'liy owner {FfCC-`._ .. <br />. ~ signed 1217/CRZ signed 12/10 & OC signed 12/18) ' <br />22. January 4a', 2010: BCG and associated subcontractors ;remobilize to site to <br />complete associated code revision CO and. building completion. <br />PO Box 2935, Dwham, NC 27725-2935 100 E. Britat~ia Ave., IItuham, NC 27704 _,,, <br />(919) 220-1141 teI (919) 220-1147 C~z <br />• nal~cvbordeuuxconstrncYloncawm <br />