Browse
Search
Agenda - 09-02-2010 - 4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 09-02-2010 - Regular Mtg.
>
Agenda - 09-02-2010 - 4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2010 3:36:11 PM
Creation date
8/27/2010 3:36:09 PM
Metadata
Fields
Template:
BOCC
Date
9/2/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4p
Document Relationships
2010-048 AMS - Clancy & Theys Construction, Co. - Third Amendment to Construction Manager at Risk Services Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2010
Minutes 09-02-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
ORD-2010-082 Animal Services Facility Third Amendment to Agree Construction Manager at Risk & Approval of Budget Amendment # 2-A
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Change Order Summary: Orange County Animal Services Facility <br />Clancy & Theys Construction Company <br />Updated: 8/6/2010 <br />CO # PCO #' Revision Descri tion ' Cost <br />1 001 Ri Add 24" RCP to Drain Pond $3,979.00 <br />1 002 Stockpile 1500 CY On Site $5,803.00 <br />1 003 Undercut SW Comer of Pad $5,582.00 <br />1 004 Haul Off Bad Topsoil $3,215.00 <br />1 005 Trench Rock @ 603-605 $33,842.00 <br />1 006 Trench Drains to Monolithic Concrete ;$4:528.00= <br />1 <br />2 010 R1 Pushbuttons @ OH Doors $407.00 <br />2 013 R2 Well, Cistern & Panel & Gear Rev. $19,445.00 <br />2 015 Parking Lot Light Sleeves $2,092.00 <br />2 016 Change Siding Color to Metallic $1,809.00 <br />2 <br />3 018 R1 Add Landfill Sanitary Sewer $247,758.00 <br />3 <br />4 020 Bond for Landfill Sanitary $5,711.00 <br />4 039 CMAR 6% OH&P on sanitary sewer plus bond prem. $15,208.00 <br />4 <br />5 021 R2 Trench Rock & Rock Bores-SWOPS $216,281.00 <br />5 R2 Trench Rock Blasting-ASF $97,870.00 <br />5 <br />6 022 Delete Cistern Sub-Base ti$5,3t5.001 <br />6 024 R2 Hardware Changes of 8/11/08 $1,801.00 <br />6 026 Ri Soffits for Duct Issues $1,159.00 <br />6 027 R1 Bulkheads @ 106,173,193 & 194 $1,974.00 <br />6 029 Ri 16" Flanged Coupling Adaptor $1,802.00 <br />6 030 Delete Trap Primers t$8,6:;5.OOj <br />6 032 Recessed Valve Cabinets ~$7.033.v0? <br />6 034 Ri Room 148 Trench to FD-2 $337.00 <br />6 036 Credit VE Plumbing Fixtures ;$679.OOj <br />6 040 Change CO-6 Frame/Add CMU $1,703.00 <br />6 045 Ri Add Knox Box $382.00 <br />6 046 Relocate Commercial Dryer $1,206.00 <br />6 052 Add Siemens as Preferred Sub $5,024.00 <br />6 058 Add P-Plam Pass Thriugh $4,067.00 <br />6 059 Surgery Area Base Cabinets $11,304.00 <br />6 060 Change all Asphalt to HD $1,809.00 <br />6 ___ <br />7R2 021 R3 Adjustment to 21 R2 $5,2t2.00'? <br />7R2 014 R2 Credit for lobby Revisions x$1;818.00 <br />7R2 023 Change 149 and 171 ceilings $583.00 <br />7R2 033 R1 WeII Water Testing $1,048.00 <br />7R2 038 R2 Street Sign Reconciliation y6,547_;;0 <br />7R2 041 Add Rear Gravel Walkway $477.00 <br />7R2 044 Ri Oxygen/Surgery Changes 5%u;x.00? <br />7R2 048 Ri Add Cat Cage Grates $11,217.00 <br />$47,893.00 <br />$23,753.00 <br />$247,758.00 <br />$20,919.00 <br />$314,151.00 <br />$10,886.00 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.