Browse
Search
Agenda - 09-02-2010 - 4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 09-02-2010 - Regular Mtg.
>
Agenda - 09-02-2010 - 4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2010 3:36:11 PM
Creation date
8/27/2010 3:36:09 PM
Metadata
Fields
Template:
BOCC
Date
9/2/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4p
Document Relationships
2010-048 AMS - Clancy & Theys Construction, Co. - Third Amendment to Construction Manager at Risk Services Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2010
Minutes 09-02-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
ORD-2010-082 Animal Services Facility Third Amendment to Agree Construction Manager at Risk & Approval of Budget Amendment # 2-A
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />Change Order Summary: Orange County Animal Services Facility <br />Clancy & Theys Construction Company <br />Updated: 8/6/2010 <br />C0 # PCO # ' Revision Descri tion Cost <br />14 (9) 109 Paint downspout leaders $639.00 <br />14 (9) 114 Credit unused grading $ ,t;; 3,;;0; <br />14(9) 117 Walk-in freezer credit !-s?,v:?g_003 <br />is (s} $26,638.00 <br />14 (10) 084 Plumbing and controls scope not in Quate scope $14,263.00 <br />14 (10) 090 Rl Re-work RFD covers $1,658.00 <br />14 (10) 093 Upgrade site lighting $940.00 <br />14 (10) 100 Replace lighting sleeve $1,757.00 <br />14 (10) 105 Revised floor drains, well pump, etc. $2,412.00 <br />14 (10) 107 Temporary glass for alarm testing $1,542.00 <br />14 (10) 112 Repainting and Touchup $3,668.00 <br />14 (10) 116 Six trench drain covers and sally port $1,126.00 <br />14 (io) $27,366.00`': <br />14 (11 R) 017 Interior control joints added in CMU $454.00 <br />14 (11 R) 063 Extend Gas to Rogers Road $16,747.00 <br />14 (11 R) 085 Rl Plumbin revisions' $41,608.00 <br />14 (11 R) 111 Post move touchup painting $3,316.00 <br />14 (11 R) 115 Owner furnished equipment connections $8,875.00 <br />14 (11 R) $71,000.00 <br />14 (13) 23 Rl Change 149 and 171 ceilings $301.00 <br />14 (13) 028 Overhead dock door buttons $441.00 <br />14 (13) 118 Roof curb relocation error by C&T $874.00 <br />14 (13) 119 15% markup on CMU sealant installation $668.00 <br />14 (13) 120 Survey to find dimensional errors on dwgs $2,188.00 <br />14 (13) 121 Repaint entry ceiling $151.00 <br />14 (13) 122 Error in base contract amount for Aspalt Experts $1,296.00 <br />14 (13) 123 Stainless steel scope gaps and rework $2,368.00 <br />14 (13) 124 IRN 89 math error on PCO 5R1 $2,141.00 <br />14 (13) $10,428.00 <br />14 (rec) Close-out adjustment credit ;132,2 `;9.tJ~~) <br />14 <br />Totals: <br />$3,193.00 <br />$731,059 <br />Notes <br />1. Reduced per agreement with CMAR <br />
The URL can be used to link to this page
Your browser does not support the video tag.