Orange County NC Website
10 <br />Change Order Summary: Orange County Animal Services Facility <br />Clancy & Theys Construction Company <br />Updated: 8/6/2010 <br />CO # PCO # ' -Revision ` Descri tion Cost <br />7R2 049 Add Wave Dock Bumpers $1,259.00 <br />7R2 054 Temporary Structure Silt pond $1,005.00 <br />7R2 056 Add Junction Box per DOT $3,597.00 <br />7R2 065 Increase Door from 3'-0" to 3'-8" $108.00 <br />7R2 067 Delete Metal Shelves 02,552.03) <br />7R2 070 Add 4" Fiber Sleeve Under Roadway $308.00 <br />7R2 073 . Add Pressure Treated Wood Bases $613.00 <br />7R2 075 Delete Vortex Protectors ($i,14z.~0i <br />7R2 077 Add dryer fire Tine $2,027.00 <br />7R2 079 Flashing Around Freezer $676.00 <br />7R2 082 Undercut unsuitable soil $3,535.00 <br />7R2 088 Revised landscape planting $301.00 <br />7R2 091 Add wheelstops at freezer $201.00 <br />7R2 094 Add boiler cut off switches $867.00 <br />7R2 095 Tie door controls to fire alarm $266.00 <br />7R2 098 Change CRS to CRC fixtures $498.00 <br />7R2 099 Change lighting in versatile hold $445.00 <br />7R2 101 Reface cat condos $2,542.00 <br />7R2 102 Add sidewalks/ramps $8,830.00 <br />7R2 103 Assemble Cat Condos $492.00 <br />7R2 104 Install freezer $466.00 <br />7R2 <br />8R3 031 Foundation Drain Trunk Lines $5,185.00 <br />8R3 035 R1 Add Downspout Nozzles, etc. $2,680.00 <br />SR3 064 Ri Extend Gas to Rogers Road $25,120.00 <br />8R3 074 Install Plywood Ceiling to plan $405.00 <br />8R3 081 Modify Lobby Trellis $4,194.00 <br />SR3 087 Wire card reader strikes $1,560.00 <br />SR3 <br />14 (9) 008 R2 Revised FRFD risers and grates $5,479.00 <br />14 (9) 025 R3 Roof Drain Leader $1,897.00 <br />14 (9) 042 R3 Washer/Dryer hookups, chases, cut floor $14,599.00 <br />14 (9) 050 Add soffits at CO-1 $751.00 <br />14 (9) 053 Re-mobilization of grading sub $603.00 <br />14 (9) 055 Ri Double handle dirt removal $11,345.00 <br />14 (9) 062 Seal exterior of CMU $4,943.00 <br />14 (9) 066 Revise soffit at diagonal brace $1,228.00 <br />14 (9) 068 Ri Furr shower walls for file install $350.00 <br />14 (9) 069 R1 Stacked W/D & X-ray power (120V) $1,401.00 <br />14 (9) 071 Revise wiring of unit heaters $281.00 <br />14 (9) 072 Revise wiring of overhead doors $1,067.00 <br />14 (9) 78 R1 Misc. Concrete Adjustments $6,221.00 <br />14 (9) 080 R1 Flush and clean new sanitary sewer $538.00 <br />14 (9) 089 Delete EIFS ~:3ca':.i.`•C7? <br />14 (9) 092 Install 3 dryer receptacles $2,021.00 <br />14 (9) 106 Credit for Owner Installed equipment ~s.~c5,00' <br />$23,362.00 <br />$39,144.00 <br />