Browse
Search
Minutes - 19890522
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1989
>
Minutes - 19890522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2013 11:52:06 AM
Creation date
8/13/2008 1:00:43 PM
Metadata
Fields
Template:
BOCC
Date
5/22/1989
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR. BEST asked Mr. Kirk what the difference is between LG-1 and NG-2 and he <br />indicated that NC-2 allowed more uses. <br />THE PUBLIC HEARING WAS GLOSED. <br />A motion was made by Commissioner Marshall, seconded by Commissioner Hartwell, to <br />refer this item to the Planning Board for a recommendation to come back to the Board no <br />sooner than August 1st. <br />VOTE: UNANIMOUS <br />c. PD-1-89 McLennan's Farm <br />'The presentation was made by Mary Scearbo. In summary this item is to <br />receive citizen comment on the proposal for a Planned Development-Special Use Permit for <br />McLennan's Farm. Mr. Leon Todd submitted an application for a residential Planned <br />Development in the Rural Buffer. The plan for McLennan's Farm includes fourteen (14) <br />lots to be served by a community low pressure system for sewage disposal. The County <br />contracted with Hazen and Sawyer, consulting engineers, to prepare a study on the <br />advisability and effectiveness of alternative systems for sewage disposal. This report <br />was presented to the Gommissioners on August 22, 19$8. <br />COUNTY ENGINEER PAUL THAMES stated that he has reviewed the engineers plan for the <br />alternative sewer system for McLennan's Farms. He indicated that the design of the <br />system includes septic tanks and pump tanks for each individual house, a force main to a <br />central pumping system and a low pressure nitrification field which is a good design in <br />general. He did, however, have specific problems with the use of the concrete block <br />construction for the central pumping structure in that it would be hard to waterproof. <br />He indicated that it would be better to use one large, or a series of smaller, precast <br />concrete septic or pumping tank type structures. The design of the lower pressure field <br />allows the liquid to be pumped out into 3000 linear feet of piping. This will create a <br />problem which will cause the field to fail in a short. period of time. Piping to 1000 or <br />1200 linear feet would be a better option. The size of the field is set at a minimum of <br />2.7 acres. They apparently have 2.75 total acres of satisfactory area where the low <br />pressure field can be located. They do not have any allowance for buffers, for <br />corrections that are necessary in the field to avoid steep slopes, or low areas where <br />the field can hold water. Generally, between 5$ and 10~ of an overall area that is <br />satisfactory is needed to be used for corrections due to sloping, etc. This 5~ to 10~ <br />would put this over the 2.75 available acres. The last major problem is the way the <br />system is proposed to be owned. Each individual homeowner will be responsible for his <br />own individual septic tank and pumping tank. The homeowners association will own the <br />remainder of the equipment which will be operated by a licensed utility operator. This <br />would result in very irregular installations of individual homeowner's septic tanks, <br />pumping systems and so forth. These will be different types of pumps and equipment. It <br />would be better°if a licensed utility operator owned the system, including the forced <br />mains and the individual lot's septic tanks and pumping facilities. These problems are <br />fairly serious and if left to the existing design on the alternative system would flaw <br />it to the extent that it would not be a reliable system. However, the problems can be <br />solved by some adjustments to design and the way the ownership is handled. They also <br />can increase the size of the field by cutting down the number of houses or decreasing <br />the number of bedrooms per house. The system is sized for 120 gallons per bedroom for <br />3.5 bedrooms per house for 14 houses. <br />COMMISSIONER MARSHALL referred to Paul Wilms' letter about Amberly. She indicated <br />that she did not know how that would effect these permits in the future. She read a <br />portion of Mr. Wilms letter which is incorporated into these minutes by reference and is <br />
The URL can be used to link to this page
Your browser does not support the video tag.