Browse
Search
Minutes - 19890406
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1989
>
Minutes - 19890406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2013 11:42:31 AM
Creation date
8/13/2008 1:00:05 PM
Metadata
Fields
Template:
BOCC
Date
4/6/1989
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- - :::, <br />-~-. -.- , <br />PAGE 2 <br />THE PUBLIC HEARING WAS OPEN FOR CITIZEN COMMENTS. <br />MICHAEL MA.7ESKI of Envirotek of Raleigh clarified that Envirotek is a firm of <br />architects and engineers, not developers, that have been acting as agents for the <br />individual property owners who have requested the land use change. He painted out on a <br />map that the site is critically located between Chapel Hill and Hillsborough, <br />approximately half-way. He illustrated on the map existing conditions which show that the <br />site itself is predominantly Rural Residential. He clarified that their application was <br />originally based on changing conditions only. He believes that there has been an error in <br />policy that caused the plan to come into existence in the first place. The present plan <br />violates fundamental principles of planning by not providing for a variety of residential <br />services available to the residential areas that are developing in the area. The plan <br />does not allow for orderly provision of services to support desired residential usage of <br />the area. The further away from I-40 the mare desirable the land becomes and there is <br />really no support. The present plan failed to recognize the negative impact of the <br />interstate highway on the adjacent properties and allow for reasonable, acceptable usage <br />of these negatively impacted properties. In other words, the land immediately adjacent to <br />the interstate is not useful for residential purposes. Another reason for the change in <br />the Comprehensive Plan is that I-40 will allow for a commezcial center to exist at the <br />interchange and traffic that would serve the center would not necessarily have to pass <br />through any residentially developed areas. What is proposed is an innovative way to <br />establish a buffer between I-40 and the surrounding community. Giving not only those <br />buffers required, but additional buffers. This is not a zoning case but it has some <br />similarity. The issue of utilities could be a determining factor in the densities that <br />could occur. - <br />"~ TOAD ZAPOLSKI, a developer, spoke about the Teer property in its context as a <br />developable piece of property. The location has a lot of merit for certain uses. It is <br />not a practical development for residential property because of the highway, as well as <br />the site conditions of very poor soil. The topography and the access make it very <br />difficult to be used for residential. <br />MR. ZAPOLSKI answered a question from Reggie Rall stating that next to the highway, <br />in its current use, it is definitely not developable. The zoning would have to be changed <br />far it to be a developable site. <br />In answer to a question from the audience, Marvin Collins stated that if the Land Use <br />Plan designation was changed to agricultural residential, an application could be made far <br />one of two options: (1) a straight agricultural residential zoning which would require a <br />special use permit for a quarry or (2) a planned development, which would address zoning <br />and the special use permit for the quarry in one process. <br />WAYNE PHEARS, a representative of the Nello Teer Company, spoke principally to the AR <br />designated portion of the property. He explained that Envirotek has been the coordinator <br />for a group of people who are separate property owners in that area but who have filed a <br />plan far an amendment to the Comprehensive Plan. Envirotek is not the developer. They <br />are the coordinator. There is no overall developer at this time, because there is no re- <br />zoning application at this time. He gave a brief history of the property from Teer's <br />stand point. Nello Teer purchased this property in 1984 for approximately $440,000.00. <br />At the time it was purchased Teer planned to operate a crushed stone quarry on the <br />property because mining was a permitted use with a Special Use permit at that time. This <br />is all pre-rural buffer. Nello Teer spent a lot of money and time drilling on the <br />property, doing other exploratory research, and getting to the point where they could file <br />an application with the Orange County Government for a special use permit. He stated that <br />
The URL can be used to link to this page
Your browser does not support the video tag.