Orange County NC Website
Comparative Table [This Table shows where in the UDO document existing ordinance text is located] <br />Existing <br />Article/ <br />Section <br />TITLE <br />New Article/ Section <br />NOTES <br />Ill-D-1 -c <br />Application Requirements <br />2.15.2 <br />Ill-D-1 -d <br />Neighborhood Information Meeting <br />2.15.2 <br />Ill -D -1 -e <br />Planning Department Review Procedures <br />2.15.2 <br />III -D -1 -f <br />Planning Board Review and Approval Procedures <br />2.15.2 <br />III-D-1-g <br />Action Subsequent to Approval <br />2.15.2 <br />III -D -1 -h <br />Appeal Procedures <br />2.24.3 <br />III -D -1 -j <br />Approval Procedures of Subdivisions in Economic Development <br />Commercial and Industrial Nodes as identified in the Orange County <br />Comprehensive Plan <br />2.16 <br />III -D -2 <br />Reserved <br />III -D -3 <br />Preliminary Plat Approval <br />2.15.3 <br />III -D -3 -a <br />Application Requirements <br />2.15.3 <br />III -D -3 -b <br />Planning Department Review Procedures <br />2.15.3 <br />III -D -3 -c <br />Planning Board Review Procedures <br />2.15.3 <br />III -D -3 -d <br />Board of Commissioners Review and Approval Procedures <br />2.15.3 <br />III -D -3 -e <br />Action Subsequent to Approval <br />2.15.3 <br />III -D -3 -f <br />Administrative Re-Approval <br />2.15.3 <br />III-D-3-g <br />Further Time Extensions <br />2.15.3 <br />III -d -4 <br />Final Plat Approval <br />2.15.4 <br />III -D -4 -a <br />Application Requirements <br />2.15.4 <br />III -D -4 -b <br />Review and Approval Procedures <br />2.15.4 <br />III -D -4 -c <br />Action Subsequent to Approval <br />2.15.4 <br />III -D -5 <br />Appeal Procedures <br />2.24.2 <br />III -E <br />Improvements <br />7.4 <br />III -E -1 <br />Financial Guarantee <br />7.4.4 <br />III -E -2 <br />Construction Cost Estimate <br />7.4.4 <br />III -E -3 <br />Maintenance of Improvements <br />7.4.6 <br />IV <br />Required Minimum Design Standards <br />7.6 <br />IV -A <br />7.6 <br />IV -B <br />7.6 <br />IV -B -1 <br />Minimum Lot Size <br />7.6.1 <br />IV -13-2 <br />Land Suitability <br />7.6.3 <br />IV -B -2 -a <br />Flood -Prone Areas <br />7.6.3 <br />IV -B -2 -b <br />Suitability for Septic Disposal <br />7.6.3 <br />IV -13-2 -c <br />Drainage <br />7.6.3 <br />Grey shading in a cell means the section is not included in the UDO 25 <br />W <br />to <br />