Browse
Search
Agenda - 08-17-2010 - 4t
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 08-17-2010 - Regular Mtg.
>
Agenda - 08-17-2010 - 4t
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2016 8:39:37 AM
Creation date
8/16/2010 10:25:12 AM
Metadata
Fields
Template:
BOCC
Date
8/17/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4t
Document Relationships
Minutes 08-17-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> 619 Patrick Rd. (919)479-4766 <br /> Bahama,NC 27503 (919)697-0614 cell <br /> (919)479-0213 fax <br /> Asphalt Paving <br /> • 225 tons of binder @$64.65/ton at the plant including tax $ 14,546.25 <br /> • Freight$8.00/tons x 225 tons $ 1,800.00 <br /> • Binder installation 9 hrs.with:Paver @$75:00/hr., <br /> vibratory roller @$74.00/hr.,3 laborers @$37.50/hr. <br /> Foreman @$52.50 $ 2,826.00 <br /> • 140 ton sand mix @$66.80 at the plant including sales <br /> tax $ 9,352.00 <br /> • Freight$8.00/ton x 140 tons $ 1,120.00 <br /> • Sand mix installation 8 hrs.with: Paver @$75.00/hr. <br /> roller @$74.00/hr.,3 laborers @$37.50/hr. <br /> Foreman @$52.50 $ 2,512.00 <br /> Total Asphalt Paving Installation $ 32,156.25 <br /> Storm Drainage <br /> • 160 11 of Contech slotted drain with pedestrian <br /> friendly grate including freight and sales tax$51.70/ft. $ 8,272.00 <br /> • Labor and equipment to install slotted drain 22 hrs. with <br /> Yanmar 100 @$75.00/hr. and 2 laborers @$37.50/hr. <br /> Foreman @$52.50 $ 4,455.00 <br /> • 4" concrete apron to frame slotted drain by subcontractor <br /> (Cruz Brothers Concrete) $ 2,170.00 <br /> Total Storm Drainage $ 14,897.00 <br /> Total Subcontractor and work performed hourly by <br /> McQueen Construction Inc. $ 187,403.25 <br /> 3%Bonds $ 5,622.00 <br /> 3%Builder's Risk $ 5,622.00 <br /> Subtotal $ 198,647.25 <br /> 15%4H/Profit $ 29,797.09. <br /> Subtotal $228,444.34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.