Orange County NC Website
MCQUEEN CONSTRUCTION INC. <br /> 619 Patrick Rd. (919)479-4766 <br /> Bahama,NC 27503 (919)697-0614 cell <br /> (919)479-0213 fax <br /> Striping,nets,and color surfacing by North State Resurfacing <br /> Labor/Equipment including labor burden $ 7,000.00 <br /> Materials including sales tax $ 8,447.60 <br /> OH/Profit $ 2,317.40 <br /> Total $ 17,765.00 <br /> Total Subcontracted Labor&Materials $ 119,853.00 <br /> ABC Base Installation <br /> • Layout(horizontal&vertical) 12 hrs @$52.50/hr. $ 630.00 <br /> • Proof roll subgrade 1 hr. Tandem Truck @$65.00/hr. <br /> and foreman @$52.50/hr. $ 117.50 <br /> • ABC installation 590 tons @ $7.50/ton at the quarry $ 4,425.00 <br /> Freight$7.00/ton(1.5 hrs @$65.00/hr.=$97.50 for 14 tons) $ 4,130.00 <br /> Rough grade stone as delivered 21 hrs.with dozer @ <br /> $75.00/hr.,vibratory roller @$74.00/hr. and labor @ <br /> $37.50/hr.,Foreman @$52.50 . $ 5,019.00 <br /> • Set up stone and fine grade 16 hrs.with:motor grader <br /> @$75.001hr.,vibratory roller @$74.00/hr.,laborer <br /> @$37.50/hr.,water truck @$50.00/hr., <br /> Foreman @$52.50 $ 4,624.00 <br /> • Final grade prior to paving 6 hrs. with: motor grader <br /> •$75.00/hr.,vibratory roller @$74.00/hr.,laborer <br /> •$37.50/hr.,Foreman @$52.50 $ 1,434.00 <br /> • Proof roll stone 1 hr. with: Tandem @$65.00/hr. and <br /> foreman @$52.50/hr. $ 117.50 <br /> Total ABC Installation $ 20,497.00 <br /> MCQUEEN CONSTRUCTION INC. <br />