Browse
Search
Agenda - 08-17-2010 - 4t
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 08-17-2010 - Regular Mtg.
>
Agenda - 08-17-2010 - 4t
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2016 8:39:37 AM
Creation date
8/16/2010 10:25:12 AM
Metadata
Fields
Template:
BOCC
Date
8/17/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4t
Document Relationships
Minutes 08-17-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MCQUEEN CONSTRUCTION INC. <br /> 619 Patrick Rd. (919)479-4766 <br /> Bahama,NC 27503 (919)697-0614 cell <br /> (919)479-0213 fax <br /> Striping,nets,and color surfacing by North State Resurfacing <br /> Labor/Equipment including labor burden $ 7,000.00 <br /> Materials including sales tax $ 8,447.60 <br /> OH/Profit $ 2,317.40 <br /> Total $ 17,765.00 <br /> Total Subcontracted Labor&Materials $ 119,853.00 <br /> ABC Base Installation <br /> • Layout(horizontal&vertical) 12 hrs @$52.50/hr. $ 630.00 <br /> • Proof roll subgrade 1 hr. Tandem Truck @$65.00/hr. <br /> and foreman @$52.50/hr. $ 117.50 <br /> • ABC installation 590 tons @ $7.50/ton at the quarry $ 4,425.00 <br /> Freight$7.00/ton(1.5 hrs @$65.00/hr.=$97.50 for 14 tons) $ 4,130.00 <br /> Rough grade stone as delivered 21 hrs.with dozer @ <br /> $75.00/hr.,vibratory roller @$74.00/hr. and labor @ <br /> $37.50/hr.,Foreman @$52.50 . $ 5,019.00 <br /> • Set up stone and fine grade 16 hrs.with:motor grader <br /> @$75.001hr.,vibratory roller @$74.00/hr.,laborer <br /> @$37.50/hr.,water truck @$50.00/hr., <br /> Foreman @$52.50 $ 4,624.00 <br /> • Final grade prior to paving 6 hrs. with: motor grader <br /> •$75.00/hr.,vibratory roller @$74.00/hr.,laborer <br /> •$37.50/hr.,Foreman @$52.50 $ 1,434.00 <br /> • Proof roll stone 1 hr. with: Tandem @$65.00/hr. and <br /> foreman @$52.50/hr. $ 117.50 <br /> Total ABC Installation $ 20,497.00 <br /> MCQUEEN CONSTRUCTION INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.