Orange County NC Website
3 <br /> Document G701 TM - 2001 <br /> e Order _ <br /> — PROJ.EGT:(Name and address) CHANGE ORDER NUMBER: CC-3 (rt'y��po},;; OWNER❑ <br /> --- _ Fa rV1.Lw•tT Gtx il-1ity Park <br /> _: <br /> . - :195 'rorain St., Hi llsbaraugh,DiE: July,; 21110 ARCHITECT❑ <br /> -_ —- - ARCHITECT'S PROJECT NUMBER;' 716 CONTRACTOR❑ <br /> ..--TO—CONTRACTOR:(Name..and address) -- = FIELD❑ <br /> °M Queen Construct qn Co CONTRACT DATE;; September 17, 2009 <br /> 12atC �k 'Ro�id ; OTHER❑ <br /> G19 <br /> il3ahartl `'__NC 27503"- CONTRACT FOR: ieral Construction <br /> :4- he-Contract is'changed.as follows: <br /> -'(Include,wH4ere applicable,:any undisputed amount attributable to previously executed Construction Change Directives) <br /> t�Te a uLis_-roarts_-:a-riJ associated :Lighting (see attached) .. AD9 $236,86+.34 <br /> . .....:.:.... <br /> 9 ;5 0((�D.00 <br /> :.. .::. -The original{Contract:Sum)(�xa1C lT�cit }was $ _' <br /> the n4 chair <br /> .Y ieoul Y.autho�ri __ <br /> - <br /> =35,192.65 ze --CTange Orders <br /> g a <br /> - -= _= <br /> The:(Cotract Sum)' ifce)prior to this Ch ange O rder was ___ _-_ 1,021,192.65 <br /> The ill (increased)a creas <br /> Contract Sum) c�dl+tlz�t'txt�lwcRn[a� w" be in ed � " <br /> { j <br /> Change_Order in the-amount of = 26,864.34 <br /> _ ... _. . <br /> :---_- T.he.-neiv(Contrac[.SuiTi}; [ ce)including this Change Order will be $ 1,258,057 <br /> 1 <br /> The Contract Time will be(increased) ' ��I'��by 5 Xty ( 0 )days <br /> The date of Substantial Completion as of the date of this Change Order therefore is Dctober 24, 2010 <br /> (Note:This Change Order does not include changes in the Contract Sum,Contract Time or Guaranteed Maximum Price <br /> haue been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br /> Owner:and_Contractor,::in which case a Change Order is executed to supersede the Construction Change Directive.) <br /> - " :NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. <br /> Ciorley R ifoat Zack, Inc. McQueen Construction Co Grange County <br /> _ ARCHITECT(Firm name) CONTRACTOR(Firm name) OWNER(Firm name) <br /> -- .:.222 Cloister Court f`'619 Patrick Road l'0 l3ox $181 <br /> 27514 alna •_:.N =)703 Hillsborough, NC 27278 <br /> ADDRESS <br /> ` x' ( gnat ire) B Y Sigrtatrcrerle. 't <br /> 1A ett <br /> (Typed.na�rie). (Typed name)— - (?YpeFrt ) <br /> ame <br /> T:3 v O 30 <br /> DATE DATE "' DATE <br /> CAUTION:You should sign an original AIA Contract Document,on which this text appears in RED.An original assures that <br /> changes will not be obscured. <br /> AIA Document G701 TM—2001.Copyright 0 1979,1987,2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING:This <br /> A10 Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA®Document, <br /> or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. <br /> Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright viDlatwns of AIA Contract Documents,e-mail <br /> The American institute of Architects'legal counsel,copyright@aia.org. <br />