Orange County NC Website
.. I. C~ . <br />Ezhibit 3 <br />WA # 20MEBN0620996 <br />JOB TITLE Relocate Cable West Ten -Water Dept <br />ENGINEER ,Ioe oiejar <br />DATE 4/25/2006 ESTIMATE START DATE 6/1/2006 <br />nFT,a ll _ SHEET <br />MATERIAL Amount Unft Cost Material S Unit Cost Labor3 Remove S <br />BFC 400-24 3150 $4.97 $15 655.50 $2.45 $7,717.50 <br />BFC 100-24 900 $2.38 $2,142.00 $2.45 $2,205.00 <br />Restoration 4000 $0.25 $1,000.00 <br /> <br />BD7 PEDESTAL 4 $59.00 $236.00 $80.00 $320.00 <br />PED STAKES 4 $10.00 $40.00 $0.00 $0.00 <br />24X36X30 HAND HOLE 0 ~ $550.00 $0.00 $275.00 $0.00 <br />Enter Existin Ped 2 $21.00 $42.00 <br />CONV.OR DIR BORE 2° 420 $14.95 $6,279.00 <br />BM2 Gd To Rod 4 $5.00 $20.00 $23.50 $94.00 <br />SPLICE -Straight (per <br />r <br />1600 <br />$1.50 <br />$2,400.00 <br />$0.00 <br />ENGINEER 8 $60.00 $480.00 <br />TOTAL $18,093.50 $12,820.00 $0.00 <br />Budgeted Amounts for WA <br />Labor $12,820.00 <br />Material $18,100.00 <br />Taxes $1,270.00 <br />Overheads $4,640.00 <br />Total Gross Addition $36,830.00 <br />