Browse
Search
2006 NS Contract - Buckhorn Rd EDD/Gravelly Hill Water/Sewer Project - Mebtel Telephone Service Lines
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Buckhorn Rd EDD/Gravelly Hill Water/Sewer Project - Mebtel Telephone Service Lines
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2012 12:28:43 PM
Creation date
8/5/2010 2:46:33 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ~~ <br />Exhibit 2 <br /> <br />General Construction Specification <br />Projects along State Right-of--Way <br />The following are general terms and conditions which apply to: <br />• All placements are within North Carolina Department of Transportation Right-of- <br />Way. The placement of facilities on these projects is subject to NC DOT blanket <br />encroachment agreements related to placement of MebTel facilities within the <br />Right-of--Way. The related DOT forms are: <br />o Form R/W 16.3 Blanket Encroachment Agreement: Plowed-in Telephone <br />Cable on Primary and Secondary Road System <br />o Form R/W 16.3A Blanket Encroachment Agreement: <br />Telecommunications Cable Installed by Trenching on Primary and <br />Secondary Road System <br />o Form R/W 16.5 Blanket Encroachment Agreement: Underground Utility <br />Service Connections on Primary and Secondary Road Systems <br />o Form R/W 16.SA Blanket Encroachment Agreement: Aerial Utility <br />Crossings and Taps on Primary and Secondary Road Systems. <br />• Evidence of general liability insurance meeting MebTel minimum requirements, <br />currently $2,000,000 must be in available. This must be in the form of a binder <br />that covers the timeframe for the entire project. <br />• MebTel is responsible for securing all utility locates required along the route in a <br />timely manner to allow construction to proceed without delays. <br />• All cable, pedestals and related material will be provided by MebTel. <br />• MebTel shall restore Right-of--Way or private property disturbed by construction <br />activities on this project to the original condition. Material for any required <br />Right-of--Way or private property restoration shall be provided by MebTel. <br />Any correspondence related to this project should be directed to: <br />Joseph J. Olejar,.III <br />Senior Engineer <br />MebTel Communications <br />olei ari na,mebtel.com <br />919-563-8141 <br />919-563-4448 FAX <br />
The URL can be used to link to this page
Your browser does not support the video tag.