Browse
Search
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 9:12:48 AM
Creation date
8/5/2010 12:24:22 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5f
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Sheri Moore Page 12 of 14 <br />Address: 8516 Union Grove Church Road <br />City: ,Chapel Hill <br />Phone #: 933-4087 <br />Date: <br />accommodate new single-handle tub/shower faucet control and to restore <br />to proper working order. Supply and install new white porcelain-on-steel <br />tub. Size of new tub to match existing as close as standard sizing will <br />allow. Includes supply and install new finish tub/shower plumbing <br />fixtures. <br />2. Supply and install new %2" moisture resistant sheetrock on walls and <br />ceiling, including shower surround walls, complete. New surfaces to <br />match existing as close as are practical. All work to be properly sealed so <br />as to prevent water and moisture leakage. <br />3. Supply and install new standard grade sectional fiberglass shower <br />surround walls to minimum 6' above subfloor set in mastic with soap dish, <br />shampoo holder, and jamb and sill at window.. All work to be properly <br />sealed so as to prevent water and moisture leakage. <br />39 <br />4. Supply and install new tempered obscure glass shower enclosure, <br />complete. All work to be properly sealed so as to prevent water and <br />moisture leakage. <br />5. Supply and install two new grab bars in shower at locations by owner. All <br />work to be properly sealed so as to prevent water leakage. Styles and <br />colors by owner. <br />6. Supply and install new underlayment with a smooth top surface, and <br />prepare for installation of new vinyl floor cover. Supply and install new <br />vinyl floor cover per Owner selection, complete. Includes new baseboazd <br />and shoe mold, caulking all seams at baseboard and shoe mold, new metal <br />transition strip to Hall, complete. All new materials to match existing as <br />close as practical. <br />7. Supply and install new vanity and new cultured marble vanity top with <br />integral sink. Color of vanity top cultured marble to match color of <br />shower surround as close as practical. Replace existing angle-stop, shutoff <br />
The URL can be used to link to this page
Your browser does not support the video tag.