Browse
Search
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 9:12:48 AM
Creation date
8/5/2010 12:24:22 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5f
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
38 <br />Name: Sheri Moore Page 11 of 14 <br />Address: 8516 Union Grove Church Road <br />City: Chapel Hill <br />Phone #: 933-4087 <br />Date: <br />2. Remove existing damaged cabinet floor of sink cabinet and make repairs <br />to accommodate installation of new plywood floor. Supply and install <br />new 3/a" plywood floor for cabinet, including seal all penetrations and <br />seams. Prime new material and provide latex semi-gloss painted finish, <br />complete. <br />3. Remove existing countertop from base cabinets. NOTE: After countertop <br />is removed, if further damage is discovered the Owner, Contractor and <br />Rehabilitation Specialist will meet to review the work, deternne a course <br />of action and, if necessary, a cost for any additional work. Restore walls <br />and base cabinets to match existing as close as is practical and <br />accommodate installation of new formica countertop. Supply and install <br />new formica countertop with backsplash, bullnose; and end caps, <br />complete. <br />4. In existing base cabinets, remove shelves. In base cabinets, repair cabinets <br />and shelf supports to accommodate installation of new pre-finished <br />shelving. On base and wall cabinets, remove hinges, door and drawer <br />pulls, and repair doors and drawers to operate properly. Clean cabinets to <br />be ready for painting. Prime all new or "raw" surfaces of cabinets and <br />supply and install new latex enamel finish paint to outer surfaces of <br />existing base and wall cabinets. Supply and install new pre-finished <br />shelves in base cabinets. Supply and install new hinges, door and drawer <br />pulls. Restore all existing cabinets to proper working order. New <br />materials, styles and color to match existing as close as practical. <br />III. HALL BATHROOM <br />1. Remove existing vanity, toilet, medicine cabinet, light fixture, toilet paper <br />holder, towel bars, tub/shower surrounds to bare studs, and tub. Remove <br />existing floor covering and underlayment to subfloor. Remove all wall <br />coverings and sheetrock from walls down to existing framing, and all <br />ceiling coverings and sheetrock from ceiling down to existing framing. <br />NOTE: After these items are removed, if further damage is discovered the <br />Owner, Contractor and Rehabilitation Specialist will meet to review the <br />work, determine a course of action and, if necessary, a cost for any <br />additional work. At shower surround, supply and install new solid wood <br />backing for grab bars. At tub/shower, replace existing plumbing to <br />
The URL can be used to link to this page
Your browser does not support the video tag.