Browse
Search
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 9:12:48 AM
Creation date
8/5/2010 12:24:22 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5f
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Sheri Moore <br />Address: 8516 Union Grove Church Road <br />City: Chapel Hill <br />Phone #: 933-408.7 <br />Date: <br />Page 10 of 14 3 ~ <br />12. In Hall, remove, existing disappearing attic access stairs. Repair existing <br />framing to accommodate installation of new unit. Supply and install new <br />disappearing attic access stair unit, similar to existing, including all <br />necessary trim, complete. <br />13. Supply and install new address numbers on exterior of house near front <br />door. <br />J. SUB-AREA CLEANUP & TERMITE REPORT/TREATMENT <br />1. Provide pest control inspection report and chemically treat entire <br />perimeter of house for termite and pest control. Chemical treatment to be <br />done by a licensed termite or pest control company. Contractor to provide <br />owner with written proof and warranty of treatment. <br />K. SITE IlVIPROVEMENTS <br />1. T.n front yard at left comer of house, trim existing shrub away from house. <br />2. Remove two dump truck loads of owner-designated articles anti debris <br />from exterior grounds of property. <br />II. KITCHEN <br />1. Prepare existing Kitchen floor for installation of new luaun plywood <br />underlayment. Supply and install new 1/a" luaun underlayment with a <br />smooth top surface; and prepaze for installation of new vinyl floor cover. <br />Supply and install new vinyl floor cover per Owner selection. Includes <br />new baseboazd and shoe mold, caulking all seams at baseboard and shoe <br />mold, new metal .transition strips, complete. All new materials to match <br />existing as close as practical. <br />
The URL can be used to link to this page
Your browser does not support the video tag.