Browse
Search
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 9:12:48 AM
Creation date
8/5/2010 12:24:22 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5f
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Sheri Moore Page 6 of 14 3 3 <br />Address: 8516 Union Grove Church Road <br />City: ~ Chapel Hill <br />Phone #: 933-4087 <br />Date: <br />11. Supply and install new outlet in attic adjacent to new heating unit. <br />12. Supply and install new electrical to accommodate installation of new <br />range hood. Supply and install new ducted range hood, ducted to the <br />exterior, complete. <br />13. Remove existing exterior light fixture on front porch. Supply and install <br />new exterior light fixture at same location, complete. New fixture to <br />match existing as close as practical. <br />14. Remove existing exterior light fixture on right side porch. Supply and <br />install new exterior light fixture at same location, complete. New fixture <br />to match existing as close as practical. <br />E. MECHANICAL <br />1. Remove existing heating system. Supply and install new split system, <br />natural gas HVAC system, minimum 13 SEER, with insulated ductwork to <br />each room of the house. Heating unit to be installed in attic. Includes all <br />necessary gas, mechanical and electrical connections, all venting, new <br />thermostat control, and concrete pad for condenser unit, complete. <br />F. WINDOWS & SCREENS <br />1. Remove windows and frames at eight (8) locations to accommodate <br />installation of new vinyl replacement window inserts. Supply and install <br />new double-hung, dual-pane vinyl replacement window inserts with full <br />screen, complete. New windows to match new window in Bathroom. <br />
The URL can be used to link to this page
Your browser does not support the video tag.