Browse
Search
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 9:12:48 AM
Creation date
8/5/2010 12:24:22 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5f
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Sheri Moore Page 5 of 14 <br />Address: 8516 Union Grove Church Road 3 2 <br />City: Chapel Hill <br />Phone #: 933-4087 <br />Date: <br />2~. Separate and add circuits to alleviate overloaded circuits on electrical <br />system. HVAC,stove, water heater, washing machine and microwave to <br />be each on separate circuits. <br />3. Remove existing outlets throughout interior of house. Supply and install <br />new outlets at same locations, complete. <br /> <br />4. Remove existing switches throughout interior of house. Supply and install <br />new outlets at same locations, .complete. <br />5. Supply and install new GFI outlet in Bathroom. $ <br />6. Supply and install two (2) new GFI outlets in Kitchen. $ <br />7. Supply and install arc fault interrupter circuits on Bedroom circuits. $ <br />8. Supply and install new electrical to accommodate installation of new <br />"direct-wired" smoke detectors in Hall and each Bedroom. Supply and <br />install new "direct-wire" smoke detectors, complete. <br />9. Supply and install new electrical in attic to accommodate one new light <br />fixture adjacent to attic access, including one switch control located in <br />crawlspace within 3 l.f. of access door. and supply and install fixtures, <br />complete. <br />10. Supply and install new electrical in attic to accommodate installation of <br />new HVAC system, complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.