Browse
Search
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 9:12:48 AM
Creation date
8/5/2010 12:24:22 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5f
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: <br />Address: <br />City: <br />Phone #: <br />Date: <br />Sheri Moore <br />8516 Union Grove Church Road <br />Chapel Hill <br />933-4087 <br />Page 3 of 14 3 0 <br />flashing, roof jacks, metal nosing, plumbing boots, metal drip edge, etc.. <br />All metal edge flashing, nosing and drip edge to be pre-finished white <br />material. Supply and install new 25 year (minimum) composition shingle <br />roof cover over 15# felt on house, front porch and side porch, complete. <br />Includes shingle-type ridge ventilation system. Seal all penetrations <br />through roof with waterproof material. Shingles at porch roofs to have 4" <br />reveal. Style and color to match existing as close as practical. Contractor <br />to supply owner with written warranty for materials and labor. New <br />materials to match existing as close as practical. All work to code. <br />2. Supply and install new white pre-painted galvanized metal drip edge <br />flashings, new white pre-painted. seamless Ogee style gutters on house, <br />porch and carport with at least one downspout for each gutter and one <br />downspout for every 30' of gutter. Color to match existing as close as <br />practical. Each grade level downspout from house shall have a <br />splashblock directing water away from the house. <br />C. PLUMBING <br />1. In crawlspace where existing sewer line is leaking under Bathroom, clear <br />effluent from area. Repair existing leaking sewer line to restore to proper <br />working orde3~. Materials to match existing as close as is practical. Work <br />shall be performed in an efficient, workmanlike manner so as to keep <br />"down time" and temporary connections to a minimum. All work to code. <br />2. In Kitchen, remove existing water heater. Supply and install new <br />insulated "table top" 40 gallon water heater at same location, including <br />P!T valve, overflow pipe to exterior, complete. Work shall be performed <br />in an efficient, workmanlike manner so as to keep "down time" and <br />temporary connections to a minimum. All work to code. <br />3. In Kitchen, repair existing hot water line that is leaking inside of the sink <br />cabinet. New materials to match existing as close as practical. Work shall <br />be performed in an efficient, workmanlike manner so as to keep "down <br />time" and temporary connections to a minimum. All work to code. <br />
The URL can be used to link to this page
Your browser does not support the video tag.