Browse
Search
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 9:12:48 AM
Creation date
8/5/2010 12:24:22 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5f
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Sheri. Moore _ ~ Page 2 of 14 2 9 <br />Address: 8516 Union Grove Church Road <br />City: Chapel Hill <br />Phone #: 933-4087 <br />Date: <br />I. MAJOR SYSTEMS <br />A. FLOOR FRAMING <br />1. In Living Room, remove carpet and hardwood floor cover from entire <br />room. Remove subfloor to perimeter walls of room to expose existing <br />floor framing. NOTE: After existing framing is exposed and before. any <br />further work is performed, the Owner, Contractor and Rehabilitation <br />Specialist will meet to review the work, determine if further damage <br />exists, determine a course of action and, if necessary, a cost for any <br />additional work. Remove five (5) deteriorated floor joists extending from <br />front wall to intermediary wood girder. At mid-span of joists, supply and <br />install new drop girder properly anchored and supported by screw jacks <br />set on concrete pads and tied in to existing structure. Supply and install <br />five (5) new joists properly anchored and supported to drop girder, tied in <br />to existing structure, including blocking. New girder and joists to be <br />treated wood. Supply and install new subfloor over new joists with top of <br />subfloor to match existing. Supply and install new hardwood floor cover <br />over subfloor with top of floor cover to match existing. Finish hardwood <br />floor with stain and 3 coats of clear finish to match existing as close as <br />practical. Includes new baseboard and shoe mold. Floor reconstruction <br />work and any necessary disconnection of existing plumbing, electrical or <br />other utilities shall be performed in an efficient, workmanlike manner so <br />as to keep "down time" and temporary connections to a minimum. Price <br />indicated does not include interior and exterior cosmetic repairs, patching <br />cracks, painting, adjusting doors and windows, repair of siding, plumbing <br />or electrical. New materials and finishes to match existing as close as <br />practical. All work to code. <br />2. Replace one (1) damaged foundation vent in rear foundation wall of <br />house, complete. New materials and finishes to match existing as close as <br />practical. <br />B. ROOF & GUTTER <br />1. Remove existing composition shingle roof cover to sheathing on house, <br />front .porch and right side porch. NOTE: After existing roof cover is <br />removed, if further damage is discovered the Owner, Contractor and <br />Rehabilitation Specialist will meet to review the work, determine a course <br />of action and, if necessary, a cost for any additional work. Replace <br />
The URL can be used to link to this page
Your browser does not support the video tag.