Browse
Search
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 9:12:48 AM
Creation date
8/5/2010 12:24:22 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5f
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br />MEMORANDUM <br />TO: Housing Rehabilitation Contractors <br />FROM: Orange County Housing and Community Development <br />DATE: February 7, 2006 <br />RE: 2712 Mill Creek Road, Mebane -Mary Bradshaw <br />Work Writeup -Addendum 1 <br />Listed below are changes to the Lead Remediation work wrietup and bid package dated <br />1/26/06 for the referenced project. All other conditions and descriptions remain the <br />same. Please be reminded that bids will be opened and read aloud on February 21, 2006 <br />at 3:OOP.M. in the Housing and Community Development Department office at 300 W. <br />Tryon Street, Hillsborough, N.C. 27278. The changes are as follows: <br />D. EXTERIOR SIDING <br />1. Change description to read as follows: <br />Replace damaged material on both exterior gable vents of house. <br />NOTE: After removal work is complete, if further damage is <br />discovered the Owner, Contractor and Rehabilitation Specialist <br />will meet to review the work, determine a course of action and, if <br />necessary, a cost for any additional work. Wrap existing wood <br />trim with Tyvek. Supply and install new vinyl vented soffit <br />material, with all associated j-channel and fitting components, over <br />both existing gable vents in a horizontal orientation. Supply and <br />install new pre-finished white aluminum coil stock over remaining <br />existing wood trim, including proper transition to new gable vents, <br />adjacent new coil stock and existing brick siding. Style and color <br />to match existing as close as practical. Contractor to supply owner <br />with written warranty for materials and labor. <br />H:\HousingRehab\County\Bradshaw\LeadW orldAddendum 1.2-7-O6.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.