Browse
Search
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Housing Rehabilitation Contract Awards (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 9:12:48 AM
Creation date
8/5/2010 12:24:22 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5f
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Mary Bradshaw <br />Address: 2712 Mill Creek Road <br />City: Mebane <br />Phone #: 563-0958 <br />Date: <br />Page6of12 11 <br />21. Remove existing ceiling light fixture in Bedroom #1 (left, front corner). <br />Supply and install new ceiling light fixture at same location, complete. <br /> <br />22. Remove existing ceiling light fixture in Bedroom #2 (left, rear corner). <br />Supply and install new ceiling light fixture at same location, complete. <br />23. Remove existing ceiling light fixture in Bedroom #3 (left, center). Supply <br />and install new ceiling light fixture at same location, complete. <br /> <br />24. Remove existing ceiling light fixture in Hall. Supply and install new <br />ceiling light fixture at same location, complete. <br />F. MECHANICAL <br />Properly disconnect supply and service lines to two existing heating <br />systems; one in the crawlspace, and one in the Hall. Remove two existing <br />heating„ systems, including abandoned ducting in crawlspace. Make <br />adjustments to existing concrete block piers, to existing gas supply line, <br />and to existing floor openings to accommodate installation of new split <br />system propane gas pack HVAC system. Includes provide new opening in <br />Bathroom floor to accommodate installation of new insulated flexible <br />ducting. Supply and install new split system propane gas pack HVAC <br />system, with minimum 12 SEER, including insulated flexible ducting to <br />all rooms and all necessary service and supply lines, complete. Includes <br />thermostat control located at appropriate location on wall in Hall. <br />Includes concrete pad for condenser unit. Work shall be performed in an <br />efficient, workmanlike manner so as to keep "down time" and temporary <br />connections to a minimum. <br />
The URL can be used to link to this page
Your browser does not support the video tag.