Browse
Search
Minutes - 19881003
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1988
>
Minutes - 19881003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2008 11:46:13 AM
Creation date
8/13/2008 12:58:27 PM
Metadata
Fields
Template:
BOCC
Date
10/3/1988
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ .~~~ <br />1 <br />ORANGE COUNTY <br />BDARD OF CDMMISSIDNERS <br />Action Agenda <br />Item No. _ ~- <br />ACTION AGENDA ITEM ABSTRACT <br />A7eeting Date: October 3, 1988 <br />SUBJECT: BID AWARD; CONSTRUCTION/PUBLIC WORKS ADMINISTRATION BUILDING <br />DEPARTMENT: PURCHASING PUBLIC HEARING YES: -NO:XX <br />ATTACHMENT(S): INFORMATION CONTACT: Pam Janes <br />ext. 998 <br />BTD TABULATION Telephone Number- <br />FLOOR PLAN Hillsborough -732-8181 <br />fiUlLDING ELEVATION DRAWING Chapel Hill -9fi7-9251 <br />Mebane -227-2031 <br />Durham -688-7331 <br />PURPOSE: Ta consider awarding a bid to Holt Construction, Graham, NC, <br />far construction of the proposed Public Works <br />Administration Building. <br />BACKGROUND: The Public Works Administration offices are presently <br />located in a modular building which was leased from the <br />O.ran.ge County School Board in 1982 for a sum of $1.00. The ten year <br />lease will expire in 1992, at which time it will revert back to the <br />School Board according to the terms and conditions of the lease. <br />$ids for construction of the Public Works building were received from <br />five contractors on September 15, 1988, with base bids ranging from <br />$127,560 to $169,980. A tabulation is attached. The architect has <br />certified the bid tabulation and is in agreement that it is in the best <br />interest of the County to accept the low bid submitted by Holt <br />Construction Company. <br />The $130,000 appropriated for this project will cover cast of <br />construction, however, the award of .this bid will require that money be <br />transfered from other project accounts to cover the cost of architect <br />fees and to provide a nominal amount of funds to cover any contingency <br />that may be needed during the project. Those funds have been <br />identified and will be presented far approval at the next Commissioners <br />meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.