Browse
Search
Minutes - 19880822
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1988
>
Minutes - 19880822
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2013 10:40:19 AM
Creation date
8/13/2008 12:57:28 PM
Metadata
Fields
Template:
BOCC
Date
8/22/1988
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~~34 - <br />These four classifications are the heart and sole of my business. <br />I have attached to this petition a letter from a realtor showing that the- <br />value of my property will be decreased by this rezoning. While I am not <br />arguing that the commissioner's don't have a right to zone property as is in <br />the best interest of good planning, I feel that I am injured by such a rezoning <br />as this. <br />I respectfully submit to the commissioners and the planning board that <br />mine is the only commercial property at this intersection which has been <br />subjected to this rezoning and that all of the other commercial uses on the <br />north side of U- S. Highway 70 have been allowed to remain within the <br />commercial, industrial, and transition node. Why is my property any different <br />from theirs; X feel that I am being treated prejudicially! <br />I had no specific notice about the change of the node shape at this <br />intersection and I assure you that had I known of it, I would have sought to <br />keep this from happening. But it has happened and I am the one who loses - not <br />those people who live in residential houses within the new node - an existing <br />growing business moved here specifically because of the zoniag is now .told it <br />can't expand in areas that are the heart of its operations. <br />I would ask the commissioners and planning board to consider strongly that <br />performance standards and the major transportation corridor requirements can be <br />used in order to protect the people around me from any kind of problems <br />resulting from the use of this property under the GG-4 classification- <br />I want the members of both boards to know that x will do everything <br />possible in order to protect my business and to insure that my business will be <br />an asset to Orange County, to the people that work for me, and to the people <br />that live around me, and indeed to all of the people who use my services within <br />this state and country. <br />
The URL can be used to link to this page
Your browser does not support the video tag.