Browse
Search
2006 NS ERCD - MOU -Proposed Memorandum of Understanding - Haw River Trail Corridor
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS ERCD - MOU -Proposed Memorandum of Understanding - Haw River Trail Corridor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2012 4:08:38 PM
Creation date
8/2/2010 4:40:23 PM
Metadata
Fields
Template:
BOCC
Date
3/21/2006
Meeting Type
Regular Meeting
Document Type
MOU
Agenda Item
5n
Document Relationships
Agenda - 03-21-2006-5n
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 03-21-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`~f <br />Haw River, the Town of Swepsonville, the Piedmont Triad Council of Governments and non- <br />profit organizations to develop a conceptual plan for the trail; and <br />WHEREAS, the undersigned governmental agencies desire to represent a unified vision for the <br />Trail Corridor when sharing information both internally within their respective agencies and <br />externally on matters relating to the planning, development, signage, public information, <br />maintenance and management of the Trail Corridor; <br />NOW, THEREFORE, the undersigned parties hereto mutually agree: <br />1. To title this coalition of partners the "Haw River Trail Governmental Agency <br />Partnership," to speak with one unified voice for all the undersigned parties that are <br />involved in the planning, design, construction, maintenance, management and promotion <br />of the Trail <br />2. To seek and consider thoughts and ideas from non-profit organizations, private property <br />owners and citizens regarding the planning, development and management of the Trail. <br />3. To establish a name for this trail and to develop an identifiable trail marker that can be <br />used to uniformly sign segments of the Trail. <br />4. To jointly develop and endorse trail development standards for the paddle and land-based <br />trail. <br />The paddle trail standards will include the maximum length between access areas, the <br />basic design of the overall access areas including off-road access, parking, access to the <br />water and other desired or needed facilities. <br />The land-based trail standards will include, at a minimum, trail width and surfacing <br />options, parking and desired or needed facilities. <br />Both. the paddle trail and land-based trails will have uniform trail markers (to be agreed <br />upon) containing minimum basic information (to be agreed upon). <br />5. The State will coordinate activities between the land managing agencies. Implementation <br />will be carried out by the agency administering the lands through which the Trail passes, <br />with assistance by the State if required. <br />6. To explore every opportunity to acquire land or the interest in land that will provide <br />public access to or land for the Trail, its buffer, or other needed open space within their <br />.jurisdiction. <br />7. The selection and approval of the Trail route on-the-ground is the primary responsibility <br />of the land managing agency/entity. The State will assist the land managing <br />agencies/entities and holders of conservation easements with Trail layout activities. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.