Browse
Search
2006 S Planning - Hillsborough & Orange Co for National Pollutant Discharge Elimination System Phase II Services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 S Planning - Hillsborough & Orange Co for National Pollutant Discharge Elimination System Phase II Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2012 2:54:52 PM
Creation date
8/2/2010 11:54:22 AM
Metadata
Fields
Template:
BOCC
Date
3/13/2006
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
4
Document Relationships
Agenda - 03-13-2006-4
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 03-13-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
° ° ~~ 3.0 is <br />PART II of Permit, Final Limitations and controls for Permitted Discharges <br />BMP Interlocal Year Yeaz Year Year Year <br /> Res onsibili One Two Three Four Five <br />Section E of Part II: Construction Site Runoff Controls. <br />Implement a program Erosion and X X X X X <br />and establish a Sedimentation Control <br />regulatory mechanism Ordinance <br />for erosion and Implementation <br />sediment control <br />Develop requirements Erosion and X X X X X <br />on construction site Sedimentation Control <br />operators Ordinance <br /> Im lementation <br />Provide educational Erosion and X X X X X <br />and training materials Sedimentation Control <br />for construction site Ordinance <br />o erators Im lementation <br />Institute plan reviews Erosion and X X X X X <br /> Sedimentation Control <br /> Ordinance <br /> Im lementation <br />Establish public Erosion and X X X X X" <br />information procedures Sedimentation Control <br /> Ordinance <br /> Im lementation <br />Establish inspection Erosion and X X X X X <br />and enforcement Sedimentation Control <br />procedures Ordinance <br /> Im lementation <br />PART II of Permit, Final Limitations and controls for Permitted Discharg es <br />BMP Interlocal Year Year Year Year Year <br /> Res onsibili One Two Three Four Five <br />Section F of Permit: Post-Construction Site Runoff Controls <br />Establish aPost- County Has X X X <br />Construction Ministerial <br />Stormwater Responsibility <br />Mana ement Pro am <br />Establish strategies County Has X X X <br />which include BMP's Ministerial <br />appropriate for the Responsibility <br />MS4 <br />Establish a program to County Has X X X <br />control the sources of Ministerial <br />fecal colifotm to the Responsibility <br />maximum extent <br />racticable <br />Page 15 of 13 <br />ISg:orangecounty1030906 Draft Phase II Agreement to Town.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.