Orange County NC Website
1 <br />with the perpetual right and easement to go upon the Property whenever the same is reasonably <br />necessary for the purposes of constructing, inspecting, and maintaining said lines and making <br />all necessary alterations and repairs thereto along with a temporary construction easement as <br />shown on the above referenced plat. The Town of Hillsborough shall return the site in the same <br />or better condition than that which existed prior to construction. To wit, the Town will ensure <br />that the project construction contractor will: <br />• record the condition of the existing asphalt pavement on site between Valley Forge Road <br />and area where the pavement that will be removed and replaced during the laying of <br />water/sewer lines. Pavement up to and adjacent to this construction area will be <br />removed and replaced to the satisfaction of the owner if the pavement is shown to have <br />been damaged by the movement of the contractor's equipment and supplies; and <br />• remove and replace the existing chain link fence in the construction area along the <br />southeast boundary of the property. The reinstalled fencing shall consist of the existing <br />chain link fabric, insofar as it is not damaged by construction, removal, storage or <br />reinstallation operations, with new posts and rails; and <br />• install reflective construction area warning marking and fencing along the building side <br />of the trenced area within the existing paved area to ensure that the periphery of trench <br />area is readily visible in any weather and in low light condition; and <br />• backfill the portion of the trench excavation within the existing paved area to 100% <br />density, Standard Proctor: and <br />• saw cut all pavement to be removed during construction or pavement repair operations; <br />and <br />• provide minimum continuous 10" bituminous concrete base and surface course <br />pavement sections bearing 18" minimum on undisturbed earth along utility trench <br />section within paved area; and <br />• coordinate work within paved area with Builder's First Supply manager and provide one <br />week notice of work within paved area; and <br />• maintain forklift access between construction warning fencing and rear door of building; <br />and <br />• all work within existing paved area, including backfill and repaving of trench area and <br />paving repairlreplacement shall support H520 vehicular loading when complete; and <br />2 <br />