Orange County NC Website
96 D <br />Stao_es Cne and Two <br />Town <br />County <br />60.3 <br />39.7X <br />a <br />. s <br />e. The prellminary cost surmaries were prepared based upon the use of <br />construction methods proven to be of superior quality and feasibility. The <br />dam is to be constructed of roller-car~pacted concrete (RCC), an innovative <br />construction technique recommended for water control projects, and one <br />which makes it ecanamically fezsible to construct the p~aject in phases. <br />f. The Town further proposes, as part of the joint undertaking for <br />the Reservoir Project, that the Town and the Cvunty cooaerate in seeking <br />all available sources of financial assistance and participation frcr~ state <br />and/or federal pro5rams in support of recreational and water supply/utility <br />projects. <br />Section 2. This resolution shall be effective upon adoption. <br />Adopted this the 31st day of Maxch 1383. <br />TOWN CP HILLSBCRCUGH <br />I <br />5. a es, Jr., Mayo <br />Allen Ll yd, Commissioner <br />Re,~~us Smith, Ca~~risSioner f;orace H. Jchnso CoTli55ion~r <br />Booby Rile Carrnissicner J. Michael Kirby, Commission <br />-,.~ <br />;; <br />.. ~~:.a <br />