Browse
Search
Minutes - 19880104
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1988
>
Minutes - 19880104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2013 9:20:32 AM
Creation date
8/13/2008 12:53:45 PM
Metadata
Fields
Template:
BOCC
Date
1/4/1988
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 F <br />collection system and wastewater treatment facility is not . <br />available in a watershed area. Seeticotankshaforttwosbasic ~,-, <br />better than on-site convent anal p <br />reasons: (l) The care and maintenance ~sAtclustered osystem <br />hands of the individual residents, (2) <br />creates a large enough system to waebant~nsur~ngthat <br />operation and management approach then y <br />technical competence is going to be directed toward the <br />project an an annual or semi-annual basis. Most of the <br />requirements to be met by a wastewater treatment system are <br />dictated by the Department of Human Resources with <br />regulations far mare restricstcva~e is asofollowsWASA. <br />He addressed some of OWASA <br />Comment #2 regarding hydraulic loading rate - he noted that <br />the State and County approved soil loading rate far this <br />area is O.l so the rate of O.o75 is well within OWASA's <br />concern. . <br />Comment #3 regarding a dual alternating absorparanl~xesystem <br />noted that they would have to install a qu P <br />which is four pumps alternating and four dosing fields and <br />is afar more extensive hydraulic system than the dual. <br />Comment #4 regarding protective measures for accidental <br />discharge of wastewater - he indicated the treatmentwa=~ <br />being centralized at one point and the drain fields <br />being placed in the centermost port~varea ofewhichrthecState ~) <br />field and then wrapping the resew <br />is requiring 100 available perkable area left after the <br />drain fields are in place around 'the wooded portion afrthe ~ ~ - <br />creating a~natural buffer which is ~ <br />site. <br />Comment #5 regarding impact of recreatianalandenotfconducive <br />- he noted that the site is gently sloping <br />to soccer fields and baseball diamonds but rather mare <br />family recreation such as volleyball which is very inconse- <br />quential to the performance- of the drain field. He indi- <br />sated he felt there were no problems wi}~.h 'the long range <br />suitability of the sail absorption where the recreation fill <br />occur. ~ <br />~- Comment #7 regarding construction and inspection - he stated <br />- that approval of the wastewater treatment system multi be <br />obtained from the Department of Human Resources befareroval - - <br />building permit can,be issued. He felt that State app _ <br />- would indicate that this would be the best practical treat- -~:.;~ <br />meet of this land use. `:'°`~~~`~"r` <br />In regard to the Homeowner's Association, Mr. Morgan stated F~.:_:: `__ - <br />- that anytime wastewater treatment is clustered,i a <br />Homeowner's Association is required for general maintenance's= <br />e s stem. There will be strict covenants <br />and upkeep of th Y _ <br />and restrictions regarding such maintenance and upgoardshand <br />will be submitted for approval by the Staff, <br />County Attorney, He indicated there were many qualified <br />wastewater technicians available in the Orange County area <br />
The URL can be used to link to this page
Your browser does not support the video tag.