Browse
Search
Minutes - 19880104
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1988
>
Minutes - 19880104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2013 9:20:32 AM
Creation date
8/13/2008 12:53:45 PM
Metadata
Fields
Template:
BOCC
Date
1/4/1988
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 C <br />1 inspected. <br />. <br />~ <br />I <br />- <br />I <br />10. <br />The system should be operated by a technically <br /> qualified party. <br />6 11. Pump life, repair, and replacement costs should be <br />7 ! addressed. <br />8 <br />9 <br />~ Regarding the development layout, OWASA had the following <br />to I comments: _ <br />11 <br />12 <br />1. <br />Development in the watershed should be consistent with <br />t3 <br />~ the primary public objective of protection of the <br />14 public drinking water supply. <br />15 <br />t6 2. A detailed investigation of site suitability and con- <br />17 sideration of the need for dual absorption fields may <br />t$ - result in the need for greater absorption field area, <br />t9 which in turn could require modifications to the pro-~ <br />zo posed subdivision layout and development density. <br />21 <br />22 3. Provide assurance that open space areas will not be <br />23 developed. <br />24 <br />25 ~ 4. Provide assurance that sedimentation and erosion <br />2b ! control measures will be installed in a timely manner <br />~~~ ~ and permanently maintained. <br /> 5. Public utility easements should be obtained to facil- <br />~~_`' ~ itate the provision of public sewer services in the:::°: ;;: ; <br />31 event such extension is determined necessary in the` ~ "''-~ <br />32 future . <br /> <br />33 _ <br />34 ~ The Town of Carrboro has provided the following courtesy <br />35 review comments regarding the proposed planned development. <br />3b The comments are based an Carrboro-designated watershed <br />37 zoning district requirements. <br />38 <br />39 <br />~ 1. A fifty-foot buffer would be required on either side of <br />40 the intermittent streams located an the site. <br />41 <br />42 2. Proposed plans for the tract of land to the north would <br />43 be required (ie., as a phased development). <br />4~+ _ - <br />45 3. - Impervious surface limitations (maximum allowed and; <br />46 ~ - proposed) should be on the plans. - - <br />47 <br />48 4. Trees having a diameter greater than 18" should lacated_...,~~ <br /> <br />49 ~ ..,, <br />on landscape plans. "~"`'"~ <br />50 - - <br />51 - 5. The agency. ar organization which will be responsible=~'='-'-~''~ <br />c~ ~ for .maintenance. of the proposed sewer treatment facil-. <br />' ~-~ ities should be clearly noted on the plans. - <br /> - - <br />5.a ~~ ~ 6. Copies of all State. permits required for the sewage~~ <br />5b ! disposal systems should be submitted prior to issuance: <br />57 ; of any building permits. <br />58 i <br />S9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.