Orange County NC Website
~~ <br />Building a new in-county landfill diverts the greatest amount of land within Orange County. <br />Because a construction and demolition debris landfill must be maintained by the LOG when <br />using Facility F, this loss of land resources in Orange County results in a lower ranking for <br />Facility F. <br />Comprehensivenesg,. <br />Table ES-3 summarizes information collected regarding the comprehensiveness of each option. <br />Generally, because the in-county facility is publicly controlled, more comprehensive programs <br />are assumed to be applied. However, it should be noted that similar programs could be <br />implemented at the transfer station included in the out-of-county options. <br />Table ES-3 <br />Comprehenuiveness, By Option <br />-' •~ i }f~ ~ y'~~ ¢ f ` r ~~~'~~~ f~Y Y n~' r <br />~Y il~t~t ~ <br />i <br />Landfe8 , < > <br />.-:S\.. R ?}s. <br />ot <br />~ <br />f <br />a <br />~ rai~W~ ",~ <br />v~'L•'y~'x^C?'SJZ <br />~l ~ :~~,~ ~ ,. ; <br />'Qi,}?,i;i:4:;:; J <br />~~lates~ai gar~~ <br />> <br />;;:yiy ~~;~:;:6i. 4.}•-:`. ~yOi <br />~ <br />~C ,,M~dw~faF Banned- <br />'.•}•n':.iYii:•~'~~C:~Y.'•:Qayi~~~ii... F' <br />:1i <br />LiY <br />'ne <br />.! <br />. <br />:•.avY:v:;{~o <br />~ <br />L:?' <br />t .. <br />: :av <br />l¢ SK <br />ti <br />^k~F <br />• a <br />o <br />.. y <br />.•2~' <br />. <br />~ . <br />. <br />,~ .. <br />}~~ <br />~?!?.....:: <br />.: ""r <br />k` <br />> • <br />• <br />` <br />' ~: ~ <br />.. ,: .. <br />in <br />.~.,'i~x::~ :::. <br />~:':SW~.:77ocGd.~fi%L~i? <br />.aAfa . <br />s:.. <br />u ..: -. . <br />a.:<.. <br />. <br />.x.. <br />;:: <br />In-County Yes None Yes Yes <br />Laadfill <br />Facility A CBcD-Yes; Notte Yes limited <br /> Yard Waste-No <br />Facility B Yes None Yes Yes <br />Facility C Yes None Yes Yes <br />Facility D No None Yes No <br />Facility E C&D-Yes; None Yes Yes <br /> Yard Waste-No <br />Facility F C&D-No; None (est.) Yes Yes <br /> Yard Wasie- <br /> Yes <br />Integration <br />Because a new collection and reduction system has not yet been established, the level of <br />integration is measured based on the current system and its goals. Therefore, given the <br />similarity of the in-county landfill option with the existing system, this option is considered to <br />provide the greatest ease to integrate. The out-of-county options are subsequently ranked based <br />on alternative material programs that are consistent with the current system's goals. Upon <br />• selection of a revised collection and reduction system, this criterion should be re-evaluated for <br />`, each option. <br />NOR(K:\YY%10T90\E00-t-iYVP ~-5 06/95 <br />