Browse
Search
Agenda - 01-20-1998 - 10a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 01-20-1998
>
Agenda - 01-20-1998 - 10a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2010 9:18:52 AM
Creation date
7/27/2010 9:18:33 AM
Metadata
Fields
Template:
BOCC
Date
1/20/1998
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
10a
Document Relationships
Minutes - 19980120
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Recommendations <br />If it is determined that a processing facility will be developed to divert reusable and <br />recyclable materials from incoming loads, a decision will be required regarding the type <br />of facility (i.e., manual vs. semi-automated). The type of facility that is developed will <br />have an impact on the quantity of waste materials which are diverted, and therefore the <br />quantity of remaining waste which will require disposal. <br />Decisions are also required regarding suitable locations for any new C8~D processing, <br />transfer andlor landfill disposal facilities for C8~D waste materials, as well as the <br />financing and ownership of the selected facilities. <br />Facih '`:.: PotentiaG Locations <br />C8~D Processing Facility • Greene Tract <br />• manual Unfilled area of existing landfill site <br />• semi-automated Purchase of additional property <br />Disposal • Greene Tract <br />• C&D Transfer Station Unfilled area of existing landfill site <br />• C8~D Landfill Purchase of additional property <br />Note: a C&D transfer station would likely be developed in conjunction with a transfer <br />facility for mixed solid waste. <br />In order to ensure adequate time for the planning, development and construction of the <br />necessary facilities to manage CS~D waste materials beyond the life of the existing C&D <br />landfill, member governments must make immediate decisions regarding the preferred <br />future diversion and disposal option(s) for C&D waste materials. Even with the current <br />diversion activities for CAD waste materials, new diversion and disposal options will be <br />required when the existing C&D disposal site reaches capacity in approximately <br />eighteen months. Eighteen months, or more, will be required .for. the planning, <br />development, and construction of C&D waste management facilities. <br />Memo: C8D Waste Management 3 1~~y98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.