Orange County NC Website
~, .. 3 <br />seven years. This option could divert about 50~ of clean wood <br />and metal and possibly 50~ of source-separated dry wall. <br />Q~tion 5: acquire land and build a semi-automated construction <br />and demolition waste reduction and recycling facility and <br />landfill. 51.75 million facility capital costs. This option <br />could divert 90$ of clean wood, 85~ of clean metal and 50~ of dry <br />wall. We note that previous cost analyses showed a capital cost <br />of $1.55 million; however, further analysis and outside review <br />resulted in our listing higher costs. Projected facility life of <br />eight years. <br />Recommendation <br />we recommend that the Owners Group consider information from the <br />public forum and then select an option or the staff to consider <br />in preparing a budget for fiscal year 1997-98. <br />