Browse
Search
Agenda - 01-20-1998 - 10a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 01-20-1998
>
Agenda - 01-20-1998 - 10a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2010 9:18:52 AM
Creation date
7/27/2010 9:18:33 AM
Metadata
Fields
Template:
BOCC
Date
1/20/1998
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
10a
Document Relationships
Minutes - 19980120
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nC2-~=Cc =Gj <br /> <br />- TO : r.a.^_di i 11 Owr1e= 5 Group <br />=Tom: Gayle Wilson, Solid Waste Director <br />~~ <br />I ,_ L. <br />.~- ~- <br />_ y~ <br />Subject: Regulating Cor_struction and De.*noiition Waste Throue_h <br />solid Waste Planning 0=dinances <br />Date: January 22, 1997 <br />The attac::ed resolutions would request the boards of Orar_ge <br />County, Carrboro and F.illsborough to adopt, and Chapel sill to <br />strengthe_*~, similar solid waste plan ordinances that regulate the <br />following: _. <br />• reducir_g wastes ar_d requiring separat_on of recyclable <br />construction a_nd demolition wastes <br />• considering and encouraging use of bu_lding materials with <br />recycled content <br />• requiring specific types and a_~nowzts of recycling storage <br />space be set aside to accommodate collection of recyclables <br />from the operating building - <br />• governi :g all constn:ction ar_d de_*noli=ion projects with a <br />value over $50,000 regardless of type <br />• ensuri,g that demolition projects are apt approved u_^_til a <br />solid waste clan has been ar~erovec't <br />• ircorporatir_g solid waste plan i ^.spec_ions into routine <br />buildi ~g inspection practice a_*:d ir_su_ing that complia.^_ce with <br />solid waste plan stip_ ulatior_s be a r~-.urement of Corti Hued <br />buidi-c ias:,ections <br />:.dd:tiOP_ally, t~e resolution reC":e5t5 t ~t t_^_e gOVernment~S <br />CoC~Erat .O SEC'..Ire fLL*idir_g for a_Td hir= a SOliG waste Dla_^_ <br />:1~5?ECCOr :+II'=052 SaOrt sC.all be COO=Ci:lat=_ '.Jiti2 EX_s`iP_Q plar'~ :~C <br />^d inspections staffs. <br />'1.5 *'~e~lora=C'~ d1sCL'SSc=s the re50i~.2t~0i~3' reCCi;~'Z:EAdati OP_s, <br />crcvides an analysis of the eff.ctive-ess o' t?~e Town o Chapel <br />-ill's e:{ist~zg solid waste- pla and c:=cusses how ar_ acci do^al <br />ositor_ of ? a_rd=ill i __*_spector could ~ ~c=ease t__^_E proposed so•i_d <br />:•;asta pla: __^c crccra.^~'s ef=activeness. <br />BaC SC='OL'*_d <br />their DECE_ai1~Er 12, ? 996, mEeti::g, t~E Owr_ers Group E::dor5cd <br />t_^_e COACEDt Of Sc^.Ciing a rE501'1tiOIi t0 ~3Ch Ii.e_*LLDEr COVET ~T.E*:t <br />recommendi^g adcptior_ of a cou-ty-wide so? i d waste p1aP~.iag <br />
The URL can be used to link to this page
Your browser does not support the video tag.