Orange County NC Website
n <br />~~ <br />18 <br />disposal arrangements for residues could be considered. Tipping fees could be controlled by the <br />Orange Regional Landfill but negotiated with the owner/operator of the construction and <br />demolition waste management facility. Orange Regional Landfill would retain an inspector at the <br />site to ensure thaz no hazardous or otherwise improper materials would enter the landfill. The <br />Request for Proposals would be issued and evaluated prior to commitment to any detailed design of <br />our own faciliry. We would stipulate thaz the terms of the Proposals be valid during the period of <br />our detailed analysis. <br />4. Acquisition of land for a construction and demolition waste management facility. <br />Authorize staff to proceed to identify land adjoining the present construction and demolition waste <br />landfill suitable for construction of such a facility and a construction waste landfill and to proceed <br />with preliminary steps to acquiring such land. Acquisition could make use of the existing land <br />reserve funds to finance any necessary purchases. Identifying the specific amount of land needed <br />for both the processing facility and the eonstrucdon waste landfill would be interactive with the <br />engineering evaluation of facility needs. <br />Attachments: 4 <br />1. Publications and Projects by Triangie J COG on construction waste reduction p.20 <br />2. Synopsis of Responses to Request for Facpression of Interest in Construction Waste Recycling <br />Facility az Orange Regional Landfill p.2I <br />3. Details of manually-oriented constnution wasu reduction facility p.24 <br />4. Details of semi-automated construction waste reduction facility p.25 <br />