Browse
Search
Agenda - 01-20-1998 - 10a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 01-20-1998
>
Agenda - 01-20-1998 - 10a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2010 9:18:52 AM
Creation date
7/27/2010 9:18:33 AM
Metadata
Fields
Template:
BOCC
Date
1/20/1998
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
10a
Document Relationships
Minutes - 19980120
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. / <br />:1 J <br />1 ~ <br />manual facility. <br />Estimated Cost: Capital costs: $1,742,500 , <br />Annualised cost and cost per ton diverted: $615,400/11,600 tons = $53.05 per ton. Plus <br />$50,000 for solid waste plan administratorlsite inspector <br />Pros and Cons of Semi-Automated Construction Waste Sorting Facility <br />Pros of Semi-Automated: <br />• Highest potential for waste diversion of any strategy <br />• Workers are protected more than in a manually oriented facility <br />• Ability to provide more potential market areas for source separated materials, especially <br />drywall <br />• Flexibility to sort more materials as more markets become available <br />Cons of Semi Automated <br />! Potentially highest capital cost of all options <br />• Dangerous working conditions for those manually removing materials .from a conveyor. <br />belt at a picking station <br />• No experience with this type of facility - <br />Table 3 <br />Sumrnar3- of Capital Costs of Options <br />No Build $0 <br />Landfill Only 118,500 <br />Transfer Station 897,500 <br />Manual separation facility --_ 1,080,000 <br />Semi automated separation facility 1,742,500 <br />Financing <br />The following discussion applies to options 3 the transfer station, 4 the manual facility or 5 the <br />semi-automated facility. <br />There are significant costs associated with building a facility ourselves. Below are several options <br />for financing. We will provide more information and analysis at the January meeting. <br />1. If available, utilize part of existing cash reserves for some of the costs of the projecu and <br />consider leasing equipment where possible to spread the cost over several years.. Existin; land <br />reserve funds could be used to purchase land needed for any option selected. <br />2. Raise the tipping fee $16 (for semi-automated facipity in option S) to cover all cosu in the first <br />year, assuming no other cost increases. [We recognize ,that this is not a feasible option, <br />
The URL can be used to link to this page
Your browser does not support the video tag.