Browse
Search
1998 S Purchasing - Warren - Hay Mechanical Engineers Heat and Air Conditining System replacement 02-03-1998-9d
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1998
>
1998 S Purchasing - Warren - Hay Mechanical Engineers Heat and Air Conditining System replacement 02-03-1998-9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2012 9:12:25 AM
Creation date
7/26/2010 3:04:23 PM
Metadata
Fields
Template:
BOCC
Date
2/3/1998
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9d
Document Relationships
Agenda - 02-03-1998 - 9d
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1998\Agenda - 02-03-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 6 <br />FINAL PAYMENT <br />Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (I) <br />the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconforming <br />Work as provided in Subpazagraph 12.2.2 of the General Conditions and to satisfy other requirements, if any, which necessazily <br />survive final payment; and (2) a final Certificate for Payment has been issued by the Architect; such final payment shall be made by <br />the Owner not more than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows: <br />ARTICLE 7 <br />MISCELLANEOUS PROVISIONS <br />7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the ref- <br />erence refers to that provision as amended or supplemented by other provisions of the Contract Documents. <br />7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in <br />the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. <br />(/nsert rate of interest agreed upon, ij any.) <br />(Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulatiora at the Owner's mzd <br />Contractor's principal places of business, the location of the Project and elsewhere may ajject the validity ojthis provision. Legal advice should be obtained <br />with respect to deletions or modifications, and also regarding requirements such as written disclosures or waivers.) <br />7.3 Other provisions: <br />ARTICLE 8 <br />TERMINATION OR SUSPENSION <br />8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions. <br />8.2 The Work may be suspended by the Owner as provided in Article 14 of the General Conditions. <br />AtA DOCUMENT A101 • OW'VFR-COti"fRACTOR AGREF:~1F.tiT • TW'ELF'fH EI>ITIO\ • .41A ~ > 19H' <br />THI{ AMF.RICAti INSTI'rl~'i F. OP' AKCIiITECTS. I~iS tiBVC~ YORK .AA'F~I~F. ~ u , ~X~A~IIISGTOX, D.C. 3000Ci A1t)1-1987 ~J <br />WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.