Orange County NC Website
a <br />/itto c art' <br />dZ- <br />An inquiry from Mr. Roger Barr was received regarding the estimated costs that will be <br />incurred for the closure and post - closure care of the existing Orange Regional Landfill <br />site. The inquiry was related to cost data that were presented in the Permit Renewal <br />Closure Plan, "Attachment V -E, Financial Assurance Cost Estimates" (May 19, 1997, <br />Revised September 16, 1997). <br />Funds related to closure costs (installation of final cover, gas venting or collection <br />system, etc.) are included in the annual budget for the Orange Regional Landfill under <br />the line item "Contribution to Eubanks Construction Reserve ". For the 1997/98 Fiscal <br />Year, this line item was $400,000. <br />North Carolina Solid Waste Management Rules and Law includes a "Financial <br />Assurance Rule" (1994/97 NC SWM Rules and Law, Section .1628) related to costs for <br />closure and post closure care. <br />Briefly, the "Financial Assurance Rule" consists of five main sections, including: <br />(a) Applicability and Effective Date; <br />Memo: Citizen Inquiries 1 <br />