Orange County NC Website
TABLE 4 <br />SUMMARY OF MSW AND CONSTRUCTION AND <br />DEMOLITION WASTE STREAM <br />C&D ONLY <br />C&D and MSW <br />2028 30 641,975 23 1,361,257 2,003,232 <br />2029 31 667,325 24 1,431,676 2,099,001 <br />Total Capacity = <br />1,900,000 Tons <br />II <br />Study of Solid Waste Management Options <br />for the Greene and Neville Tracts JOYCE ENGINEERING, INC. <br />Orange County, North Carolina February 4, 1998 <br />Year of <br />Year of <br />Operation <br />C&D ONLY <br />Operation <br />MSW ONLY <br />MSW and C&D <br />Date <br />C� &D1 <br />Cumulative Tons <br />(MSW) <br />Cumulative Tons <br />Cumulative Tons <br />1999' <br />1 <br />14,000 <br />- <br />0 <br />114,000 <br />2000 <br />2 <br />40,572 <br />- <br />0 <br />40,572 <br />2001 <br />3 <br />65,716 <br />- <br />0 <br />65,716 <br />2002 <br />4 <br />89,432 <br />- <br />0 <br />89,432 <br />2003 <br />5 <br />1 11,720 <br />- <br />0 <br />111,720 <br />2004 <br />6 <br />132,580 <br />- <br />0 <br />132,580 <br />2005 <br />7 <br />151,922 <br />- <br />0 <br />151,922 <br />2006 <br />8 <br />169,922 <br />1 <br />50,000 <br />219,922 <br />2007 <br />9 <br />188,192 <br />2 <br />100,750 <br />288,942 <br />2008 <br />10 <br />206,736 <br />3 <br />152,261 <br />358,997 <br />2009 <br />11 <br />225,558 <br />4 <br />204,545 <br />430,103 <br />2010 <br />12 <br />244,663 <br />5 <br />257,613 <br />502,276 <br />2011 <br />13 <br />264,054 <br />6 <br />311,478 <br />575,531 <br />2012 <br />14 <br />283,736 <br />7 <br />366,150 <br />649,886 <br />2013 <br />15 <br />303,713 <br />8 <br />421,642 <br />725,355 <br />2014 <br />16 <br />323,990 <br />9 <br />477,967 <br />801,957 <br />2015 <br />17 <br />344,571 <br />10 <br />535,136 <br />879,707 <br />2016 <br />18 <br />365,461 <br />11 <br />593,163 <br />958,624 <br />2017 <br />19 <br />386,664 <br />12 <br />652,061 <br />1,038,724 <br />2018 <br />20 <br />408,185 <br />13 <br />711,841 <br />1,120,026 <br />2019 <br />21 <br />430,029 <br />14 <br />772,519 <br />1,202, 548 <br />2020 <br />22 <br />452,200 <br />15 <br />834,107 <br />1,286,307 <br />2021 <br />23 <br />474,705 <br />16 <br />896,618 <br />1,371,323 <br />2022 <br />24 <br />497,546 <br />17 <br />960;068 <br />1,457,614 <br />2023 <br />25 <br />520,731 <br />18 <br />1,024,469 <br />1,545,200 <br />2024 <br />26 <br />544,263 <br />19 <br />1,089,836 <br />1,634,099 <br />InI)c <br />17 <br />=0 ,ea <br />In <br />1 1CA 1R'4 <br />1 77d'111 <br />C&D ONLY <br />C&D and MSW <br />2028 30 641,975 23 1,361,257 2,003,232 <br />2029 31 667,325 24 1,431,676 2,099,001 <br />Total Capacity = <br />1,900,000 Tons <br />II <br />Study of Solid Waste Management Options <br />for the Greene and Neville Tracts JOYCE ENGINEERING, INC. <br />Orange County, North Carolina February 4, 1998 <br />