Orange County NC Website
z64 ~ <br />If the necessary right c` way cannot be accuirec vo_untari:v by <br />N.C. D.O.T., the project »iil not be undertaken.) <br />4. No assessmen :.s of this project will be h~-ld in <br />abeyance. <br />5. The assessments shall be Faid in the following rr,anner: <br />a. Within thirty (30) da~•s after the ;:otice of <br />Confirmation of the Assessment poll is pub'_ished, each <br />owner of the property may pay his or her assessment in <br />full. <br />b. Any assessment not paid in full as pro~~ided above <br />shall be paid in five (5) equal annual instalments with <br />the first such installment, with interest, due sixty (00) <br />days after the date that, the assessment roll is confirmec, <br />~i <br />and the remaining ins:.allments, with interest, due on the <br />same sate in each successive yesr until the assessmen is <br />jai: in full. <br />A public hearing wi_1 be he 1 at 7:30 0' cloci: p. tr.. , on tine <br />18th day of August, 1987, in the courtroom of the olc Post Of'ice, <br />Chapel ?'_ill, .North Caro_i:,G, the regular place of m6e_ing of the <br />3oard of Commissioners of Orange Coun~y, tvpr;.h Carolina, fn cider <br />to diS~u55 Gll mattews covered by th~~ Prelimi:.ary Assessment <br />Resolution. <br />Ft she time and wlace above sealed, any resident of Orance <br />County or any other interestec person .+~ay appear and be heart. <br />a <br />