Browse
Search
RES-1998-013a Resolution Approving Dry Run Subdivision - Donnie Chapman Preliminary Plan - 03-04-1998-8e
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
1990-1999
>
1998
>
RES-1998-013a Resolution Approving Dry Run Subdivision - Donnie Chapman Preliminary Plan - 03-04-1998-8e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2013 10:36:24 AM
Creation date
7/21/2010 2:56:53 PM
Metadata
Fields
Template:
BOCC
Date
3/4/1998
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
8e
Document Relationships
Agenda - 03-04-1998 - 8e
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1998\Agenda - 03-04-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• RESOLUTION <br />OF THE <br />ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS <br />Date March 4. 1998 <br />Name of Subdivision Dry Run <br />Owner/Applicant Donnie Chapman <br />The Board of County Commissioners hereby approves Dry Run subdivision preliminary plat, <br />dated September 30, 1997 containing 10 lots, subject to the fulfillment of requirements specified <br />herein. <br />A. Sewage Disposal <br />1. Each residential lot, shall contain an adequate area for septic disposal, and repair <br />. area, approved by the Orange County Division of Environmental Health. <br />2. Disclosure that the septic system location may restrict the size and location of <br />improvements shall be included in a document describing development <br />restrictions to be recorded concurrently with the Final Plat. The document shall <br />also disclose that information regarding the tentative location of septic systems is <br />available from the Orange County Health Department, Division of Environmental <br />Health. <br />B. Roads and Access <br />1. Dry Run Drive shall be constructed to Class A private road standards within a 50 <br />foot right-of--way. <br />Dry Run Drive shall be inspected, and the construction certified in writing to the <br />Orange County Planning Department by a North Carolina Professional Engineer, <br />or a North Carolina Registered Land surveyor. The location of the travelway <br />within the platted private road right-of--way shall also be certified. <br />OR <br />A letter of credit, escrow agreement, or bond shall be submitted to secure <br />construction and inspection of Dry Run Drive to Class A private road standards. <br />• An estimate of the construction and certification costs must be prepared by a <br />certified/licensed engineer or grading contractor and submitted to the Planning <br />and Inspections Department. The financial guarantee must reflect 110% of that <br />estimate and be issued by an accredited financial institution licensed to do <br />business in North Carolina. <br />
The URL can be used to link to this page
Your browser does not support the video tag.